1 |
I.,Namgung, B.G.Na, S.K.Lee, and Y.B.Kim, 'Re-assessment of Remotely Controlled Fueling Machine FARE Device Operational Characteristic of Wolsong NPP', PBNC-2002 Conference, Shenzhen, China, Oct. (2002)
|
2 |
I. Namgung, 'Analysis of Fuelling Sequence and Fatigue Life for 4-Bundle Shift Refuelling scheme in CANDU6 NPP', Journal of KNS, Vol.34, No.2, (2002)
과학기술학회마을
|
3 |
W.F. Waters, 'Fuel String Force Measurement for 37 Element Fuels', AECL-IR280, (1978)
|
4 |
Wolsong NPP - Flow Assist Ram Extension (FARE) Tool Desion Manual, (1994)
|
5 |
S.Yeramilli and R.S.Morrow, 'Flow Assist Ram Extension (FARE) Method for On-Power Refuelling of Low Channels At Pickering', AECL Memo, (1972)
|
6 |
Wolsong NPP - Primary Heat Transport System Design Manual, (1995)
|
7 |
Wolsong NPP - FARE device drawings, 1994
|
8 |
Wolsong NPP - Fuelling Machine Head Design Manual, (1995)
|