1 |
Ihn Namgung and B.G. Na, 'Analysis of F/M Duty Cycle and O/M Cost for Four-Bundle Shift Refuelling Scheme in CANDU6 NPP,' Proceedings of the Korean Nuclear Society Spring Meeting, Cheju, korea, May (2001)
과학기술학회마을
|
2 |
Ihn Namgung, 'Design Report - Stress Analysis of F/M Head Assembly Pressure Boundary Component', AECL, (1999)
|
3 |
H.Choi, W.I.Ko, MS.Yang, I.Namgung, B.G.Na, 'Economic Analysis on Direct Use of Spent Pressurized Water Reactor Fuel in CANDU Reactors-Ⅱ: DUPIC Fuel Handling Cost', Vol.134, No. 2, pp.130-148, Nuclear Technology, May, (2001)
|
4 |
Wolsong Nuclear Power Plant Unit 2,3&4 Final Safety Analysis Report, Vol.6. Chapter 9., Korea Electric Power Corporation, (1997)
|