1 |
W.D Bell(2010), "Systems Engineering Test and Evaluation - The Integration Process," ITEA Journal, 31:56-62
|
2 |
국방전력발전업무훈령, 훈령 제1388호, 2012.2.3.
|
3 |
Jack K. Thompson(2010) "Recognizing the test development Life Cycle," ITEA Journal, 31 :103-108
|
4 |
Brian Simmons(2012), "T&E-The speed of need,," ITEA Journal, 33:5-8
|
5 |
Randon R. Herrin, Neil L. Barret(2012), "Interope - rability Testing at the Speed of Need,." ITEA Journal, 33:15-29
|
6 |
Sung Hyuck Ye(2012),"On the development of IT-based test information system to share test infrastructure and advanced test requirement process for industry in Korea,." ITEA Annual symposium
|
7 |
B.J. Yoo et at al(2012), "Systems Engineering based Live Fire Test of Weapon systems," KIMST, 5:28-35
과학기술학회마을
DOI
ScienceOn
|
8 |
Y.M. Kim and J.C. Lee(2012) "On the integration of systems design and system safety process from an integrated data model viewpoint," Korea Safety Management & Science, 14:107-116
DOI
ScienceOn
|
9 |
Ray C. Terry(2005), "System safety in systems engineering process," NDIA 8th Annual systems engineering conference
|
10 |
Jeff A. Estefan(2008), "Survey of Model-Based Systems Engineering(MESE) Methodologies," Rev. B, INCOSE Tech. Pub., INCOSE-TD-2007 003-01
|
11 |
Markus Hoppe, Avner Engel(2005), "Improving the VVT Process: Evaluating the SysTest Results in Six Industrial Pilot Projects," Proceedings of the 15th Annual INCOSE
|
12 |
Clifton A. Ericson, II(2005), "Hazard Analysis Techniques for system safety," John Wiley & Sons, Inc.
|
13 |
Joseph C. Chen, et al(2003)., "Modeling an off-nominal launch vehicle trajectory for range safety link analysis," Aerospace Conference, 2003 proceedings, 7:3419-3426.
|