1 |
Black, J. T., The Design of the Factory with a future, McGraw-Hill, Inc., 1991
|
2 |
Miltenburg, J. and J. Wijngaard, 'The V-Line Balancing Problem,' Management Science, Vol.40, No.10 (1994), pp.1378-1388
DOI
ScienceOn
|
3 |
Sparling, D. and J. Miltenburg, 'The mixed-model V-line balancing problem,' International Journal of Production Research, Vol.36, No.2(1998), pp.485-501
DOI
ScienceOn
|
4 |
Ueno T., Yuichi T., 'A study on Assembling Line System Based on the Relationship between Work Element and Cycle Time,' Journal of Japan Industrial Management Association, Vol.45, No.4(1974), pp.337-344
|
5 |
Degarmo, E. Paul, J. T. Black and Ronald A. Kohser, Materials and Processes in Manufacturing, 8th ed., Prentice-Hall, Inc., 1997
|
6 |
Scholl, A. and R. Klein :ULINO:, 'Optimally Balancing V-Shaped JIT Assembly Lines,' International Journal of Production Research, Vol.37, No.4(1999), pp.721-736
DOI
ScienceOn
|
7 |
Moden, Y., Toyota Production System, (2nd Ed.), Industrial Engineering and Management Press, Institute of Industrial Engineers, Norcross, GA, 1993
|
8 |
Shingo, Shigeo, A Study of the Toyota Production Systems, Productivity Press, 1989
|
9 |
Redford, A. and Chal, J., Design for Assembly, McGraw-Hill, Inc., 1994
|
10 |
Urban , J. T., 'Optimal Balancing of U-Shaped Assembly Lines,' Management Science, Vol.44, No.5(1998), pp.738-741
DOI
ScienceOn
|
11 |
Edward J. Anderson, The Management of Manufacturing Models and Analysis, Addison Wesley, Great Britain, 1994
|