1 |
한국수자원공사, 2006, "소수력 개발 적지조사 보고서," 7-3-8장.
|
2 |
J. Andrews & N. jelley. "Energy science principal, echonologies, and impacts," pp. 70-71.
|
3 |
(財日)本農業土木綜合硏究所, 1987, "Engineering Manual for Irrigation & drainage Small scale hydropower generation," 제 1권, pp. 193-199.
|
4 |
European small hydropower association, 2004, "Guide on how to develop a small hydropower plant chapter 6," pp. 152-198.
|
5 |
이원한, 2004, "發電水力工學," 東明社, pp. 3-15.
|
6 |
이응천, 2011, "댐 및 수력발전 공학," 씨아이알, pp. 239-311.
|
7 |
이철형, 주영철, 박완순. "Ferformance characteristics of kaplan turbine," Journal of the korean solar energy society Vol. 21, No. 1.
|
8 |
이철형, 박완순. 2007, "Study on the kaplan type turbine for low head hydro resources," Civil expo 2007. 10, pp. 3299-3302.
|
9 |
오형우, 이상훈, 박노현, 유진승, 2010, "마이크로 펠튼 터빈의 버킷에 관한 설계," 제 4회 유체기계 핵심기술 강습회, pp. 45-54.
|
10 |
P. Novak, A.I.B. Moffat and C. Nalluri and R. Narayanan, 2001, "Hydraulic Structures Third Edition," pp. 468-521.
|
11 |
J. butler, "How to build & operate your own small hydroelectric plant," pp. 287-296.
|
12 |
S. Davis, "serious water power solution from the experts microhydro. edited," pp. 151-159.
|
13 |
J. Giesecke, E. l Mosony, "Wasserkraftanlagen Planung, Bau und Betrieb. 5. aktualisierte und erweiterte Auflage," pp. 523-533.
|
14 |
EPRI Project Mnanger: D. Gray, 1999, "Hydro Life xtension Modernization Guides. Volume 1: Overall Process, Final Report," December.
|
15 |
EPRI Project Manger: D.Gray, 2000, "Hydro Life Extension Modernization Guides. Volume 2: Hydromechanical Equipment. Final Report," August.
|