1 |
Bruland, A., 2000, Hard Rock Tunnel Boring - Advance rate and cutter wear, Vol. 3, Doctoral Thesis at NTNU.
|
2 |
Farrokh, E., 2012, Study of Utilization Factor and Advance Rate of Hard Rock TBMs, Ph.D. Thesis, Department of Energy and Minerals Engineering, The Pennsylvania State University, USA.
|
3 |
Frough, O., Torabi, S.R., and Yagiz, S., 2015, Application of RMR for Estimating Rock-Mass-Related TBM Utilization and Performance Parameters: A Case Study, Rock Mech. Rock Eng., 48(3), 1305-1312.
DOI
|
4 |
Jeong, H.Y., Jeon, S., Cho, J.W., Chang, S.H., and Bae, G.J., 2011, Assessment of Cutting Performance of a TBM Disc Cutter for Anisotropic Rock by Linear Cutting Test, Journal of Korean Society for Rock Mechanics, 21(6), 508-517.
|
5 |
Jeong, H.Y., Jeon, S., and Cho, J.W., 2012, A Study on Punch Penetration Test for Performance Estimation of Tunnel Boring Machine, Journal of Korean Society for Rock Mechanics, 22(2), 144-156.
|
6 |
Park, C.H., Shin, J.H., and Han, G.C., 2011, A Study on the Characteristics and Prediction of TBM Utilization Factor, Proceedings of Korean Society for Rock Mechanics, Korea, 241-246.
|
7 |
Rostami, J., 1997, Development of a Force Estimation Model for Rock Fragmentation with Disc Cutters through Theoretical Modeling and Physical Measurement of Crushed Zone Pressure, Ph.D. Thesis, Colorado School of Mines, Golden, Colorado, USA.
|
8 |
Rostami, J., 2016, Performance Prediction of Hard Rock Tunnel Boring Machines (TBMs) in Difficult Ground, Tunnelling and Underground Space Technology, 57, 173-182.
DOI
|
9 |
Valle, N.D., Fuoco, S., and Brino, G., 2016, Detailed TBM Boring Cycle Estimation Using Rock Mass Rating System, 2nd International Conference on Tunnel Boring Machines in Difficult Grounds (TBM DiGs Istanbul), Istanbul.
|
10 |
Yagiz , S., Kim, T., Frough, O., and Torabi, S.R., 2013, A Rock Mass Rating System for Predicting TBM Utilization, ISRM International Symposium - EUROCK 2013, 23-26 October, Wroclaw, Poland, 921-925.
|