1 |
Siemens. 2011. Plant Simulation. Siemens. Available at: www.siemens.com. Accessed 10 August 2011.
|
2 |
David K, W. 2005. Simulation with Arena 3rd ed., McGrawHill.
|
3 |
Park, Y. H. and Miller, D. M. 2002. Multi-Factor Analysis of Firm-Level Performance Through Feed-Forward, Feed-Back Relationships. The Korea Society For Simulation 11(1):59-70.
과학기술학회마을
|
4 |
Seong D. H. 1997. A Simulation Model for the Analysis of Newly Constructed Coil Center. The Korean Production And Operations Management Society 8(1):75-88.
|
5 |
Mehra S., R. Anthony I., Gregory T. 2006. simulation-based comparison of batch sizes in a continuous processing industry. Production Planning & Control 17(1):54-66.
DOI
ScienceOn
|
6 |
Bae, J. U. 2003. A Simulation Study on Buffer Yard in a Container Terminal. Journal of the Korean Institute of Plant Engineering 8(4):95-105.
|
7 |
Han, M. S. and D. J. Park, 2002. Optimal buffer allocation of serial production lines with quality inspection machines. Computers & Industrial Engineering 42(1):75-89.
DOI
ScienceOn
|
8 |
Ha, J. W. 2003. Analysis of the Paint Shop Layout and Operation Policy Using Simulation. Journal of the Korean Institute of Plant Engineering 8(1):185-196.
|
9 |
Boyd L. 1998. Digital factories. Computer Graphics World 21(5):45-53.
|
10 |
Buzacott, J. A. 1967. Automatic Transfer Lines with buffer stocks. The International Journal of Production Research 5(3):183-200.
DOI
|
11 |
Spedding T. A. and K. K. Chan, 2001. System level improvement using discrete event simulation. International Journal of Quality & Reliability Management 18(1):84-103.
DOI
ScienceOn
|
12 |
Hong, Y. S. and D. H. Seong, 1992. The analysis of an unreliable two-machine production line with random processing times. European Journal of Operational Research 68(2):228-235.
DOI
|