Browse > Article
http://dx.doi.org/10.5389/KSAE.2008.50.6.061

Life Cycle Cost Method by Segregation of Safety and Function  

Lee, Joon-Gu (한국농촌공사 강화지사)
Kim, Han-Jung (한경대학교 지역자원시스템공학과)
Yoon, Seong-Su (충북대학교 지역건설공학)
Choi, Won (서울대학교 지역시스템공학)
Lee, Hyung-Jin (서울대학교 지역시스템공학)
Kim, Jong-Ok (공주대학교 지역건설공학)
Jung, Nam-Su (공주대학교 지역건설공학)
Lee, Jeong-Jae (서울대학교 생태조경.지역시스템공학부)
Publication Information
Journal of The Korean Society of Agricultural Engineers / v.50, no.6, 2008 , pp. 61-71 More about this Journal
Abstract
An advanced model for assessing life cycle cost of the facility containing several subdivisions has been proposed with systems engineering approach. This model evaluates the maintenance cost in the sphere of the safety as well as in that of its functionality. The proposed approach has been shown to be more reasonable and practical than existing models. The serviceability and reasonability have been proved through evaluating life cycle cost of the reservoir which is a representative agricultural facility. In addition, the proposed method is helpful to make a maintenance strategy using the survival probability in the point of safety and functionality.
Keywords
Life Cycle Cost; Reservoir; Survival Probability; Life Time Distribution Function; FTA; AHP;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Frangopol, Dan M. & H. Furuta, 2001, USJapan Workshop on Life-Cycle Cost Analysis and Design of Civil Infrastructure Systems, Reston, VA:ASCE
2 Freyermuth, Clifford L., 2001, Life-Cycle Cost Analysis for Large Segmental Bridges, Concrete International, pp.89-95
3 Kay, Dianne H., Susan M. Morgan & S. N. Bodapati, 2001, Service Life of Illinois Highway Noise Barriers Projected from Current Condition Survey, Journal of Performance of Constructed Facilities, 15(3), pp.82-89   DOI   ScienceOn
4 Park, S.-K. & Alfred H-S. Ang, 1997, Costeffective Reliability of RC structure in Korea under earthquake, Journal of Korea Concrete Institute, 9(5), pp.137-148
5 P.E., Susan M. Morgan, Dianne H. Kay P.E., & S. N. Bodapati P.E., 2001, Study of Noise Barrier Life-Cycle Costing, Journal of Transportation Engineering, 127(3), pp.230-236   DOI   ScienceOn
6 Yang, S.-I., 2002, Time Dependent Maintenance Models of Bridges, Journal of Korean Society of Steel Construction, 14(3), pp.443-452
7 Garboczi, Edward J., Dale P. Bentz & Geoffrey J. Frohnsdorff, 2000, Knowledge- Based Systems and Computational Tools for Concrete, Concrete International, pp.24-27
8 Jung, S.-S. & J.-J. Yee, 2000, A Study on the Development of Software for Life Cycle Cost Evaluation of HVAC system, Journal of Architectural Institute of Korea-Planning and Design Committee, 16(7), pp.101-108
9 Lee, S.-J., T.-K. Park, C.-S. Lee & Y.-I. Kim, 2002, A study on the Economic Evaluation Method for Remodeling of Deteriorated Military Facilities, Journal of Architectural Institute of Korea-Structures Committee, 18 (5), pp.105-112
10 Liu, Min & Dan M. Frangopol, 2004, Optimal bridge maintenance planning based on probabilistic performance prediction, Engineering Structures, 26, pp.991-1002   DOI   ScienceOn
11 Fuller, Sieglinde K., 1996, Life-Cycle Costing Methodology, NIST
12 Singh, Balaram K., 1996, How Significant is LCCA?, Concrete International, pp.59-62
13 Violetta, B., 2002, Life-365 Service Life Prediction Model, Concrete International, pp. 53-57
14 Chaaya, M. & A. Jaafaari, 2001, Cognizance of Visual Design Management in Life-Cycle Project Management, Journal of Management in Engineering, 17(1), pp.49-57   DOI   ScienceOn
15 Ries, R. & A. Mahdavi, 2001, Integrated Computational Life-Cycle Assessment of Buildings, Journal of Computing in Civil Engineering, 15(1), pp.59-66   DOI   ScienceOn
16 Jung, S.-S. & D.-W. Kim, 2002, A Study on the Development of Cost Breakdown Structure in Present Worth Method and Annual Worth Method by HVAC system for systematic LCC Calculation, Journal of Architectural Institute of Korea-Structures Committee, 18 (6), pp.167-174
17 Cho, H.-N., D.-H. Min & K.-M. Lee, 2001, Optimum Life-Cycle Cost Design of Orthotropic Steel Deck Bridges, Steel Structures
18 Oh, Y.-I., S.-B. Lee & T.-K. Lee, 1997, A Study on the Economic Analysis in Apartment House Based on Life Cycle Costing Techniques, Journal of Architectural Institute of Korea, 13(3), pp.325-333
19 Yang, S.-I., 2002, Optimum Maintenance Strategy of Bridges Based on System Reliability, Journal of Korean Society of Steel Construction, 14(5), pp.627-639
20 Ehlen, Mark A., 1997, Life-Cycle Costs of New Construction Materials, Journal of Infrastructure systems, pp.129-133
21 Farhey, Daniel N., R. Naghavi, A. Levi, Aniruddha M. Thakur, Mark A. Pickett, Douglas K. Nims & Emin A. Aktan, 2000, Deterioration Assessment and Rehabilitation Design of Existing Steel Bridge, Journal of Bridge Engineering, 5(1), pp.39-48   DOI
22 Hong, H. P., 2000, Assessment of Reliability of Aging Reinforced Concrete Structures, Journal of Structural Engineering, 126(12), pp.1458-1465   DOI   ScienceOn
23 Park, S.-K. 2001, LCC Optimization for Reinforced Concrete Structures under Seismic Hazards, KCI Concrete Journal, 13(2), pp. 26-32
24 Yang, S.-I., 2001, REmaining Life Perdiction of Deteriorating Bridge Based on Lifetime System Reliability, Journal of Korean Society of Steel Construction, 13(5), pp.467-476
25 Engelund, S., D. S. John & B. Sorensen, 1999, Evaluation of Repair and Maintenance Strategies for Concrete Coastal Bridges on a Probabilistic Basis, ACI Material Journal, pp.160-167
26 Yang, S.-I., 2002, Lifetime Prediction of Existing Highway Bridges Using System Reliability Approach, Journal of Korean Society of Steel Construction, 14(2), pp.365-373