1 |
Kulkarni, A.S., Li, B. and Yip, W.K. (2008)," Finite Element analysis of precast hybrid-steel concrete connections under cyclic loading", J. Construct. Steel Res., 64(2), 190-201.
DOI
|
2 |
Kwong, Y.W. and Teng, S. (2000), "Hybrid precast concrete beam", CSE Res. Bulletin, No.13, pp. 78-80.
|
3 |
Li, B., Kulkarni, A.S. and Leong, C.L. (2009), "Seismic performance of precast hybrid-steel concrete connections", J. Earthq. Eng., 13(5), 667-689.
DOI
|
4 |
Loo, Y.C. and Yao, B.Z. (1995), "Static and repeated load tests on precast concrete beam-to-column", PCI Journal, 40(2), 106-115.
DOI
|
5 |
Mahdi, A.A. (1992), "Moment-rotation behaviour of connections in precast concrete structures", Ph.D. Thesis; University of Nottingham, Nottingham, UK.
|
6 |
Marsono, A.K., Ying, W.J., Md. Tap, M., Chieh, Y.C. and Haddadi, A. (2015), "Standard Verification Test for Industrialised Building System (IBS) Repetitive Manufacturing", Procedia CIRP, 26(2015), 252-257.
DOI
|
7 |
Moghadasi, M. and Marsono, A.K. (2012), "Comparative experimental study of full-scale H-subframe using a new industrialized building system and monolithic reinforced concrete beam-to-column connection", Struct. Des. Tall Special Build., 23(8), 563-579.
DOI
|
8 |
Moghadasi, M., Marsono, A.K. and Mohammadyan-Yasouj, S.E. (2017), "A study on rotational behaviour of a new industrialised building system connection", Steel Compos. Struct., Int. J., 25(2), 245-255.
|
9 |
Mohamed, S.A.M. and Jolly, C.K. (1995), "An experimental study of the behaviour of sleeved bolt connections in precast concrete frames", Magaz. Concrete Res., 47(171), 119-127.
DOI
|
10 |
Kulkarni, A.S. and Li, B. (2009), "Investigations of seismic behaviour of hybrid connections", PCI Journal, 54(1), 67-87.
DOI
|
11 |
Moy, C.K.S. (2018), "Structural performance of a precast beam to column connection strengthened with FRP under monotonic loading", Appl. Mech. Mater., 878, 121-125.
DOI
|
12 |
Omer, J.H.M., Kueh, A.B.H. and Shek, P.N. (2018), "Threedimensional numerical and linearly distributed multi-parameter fitted analytical modelling of hybrid beam-column with partially welded flush end-plate connection", Adv. Struct. Eng., Article first published online: February 14, 2018. DOI: https://doi.org/10.1177/1369433218754698
DOI
|
13 |
Pillai, S.U. and Kirk, D.W. (1981), "Ductile beam-column connection in precast concrete", ACI Journal, 78(6) 480-487.
|
14 |
Rahman, A.B.A., Hock, L.J., Saim, A.A. and Osman, M.H. (2007), "Design and testing of a full scale precast concrete h-subframe", Proceedings of the 1st Construction Industry Research Achievement International Conference (CIRAC2007), Kuala Lumpur, Malaysia, March.
|
15 |
Seckin, M. and Fu, H.C. (1990), "Beam-column connections in precast reinforced concrete construction", ACI Structural Journal, 87(3), 252-261.
|
16 |
Stanton, J.F., Anderson, R.G., Dolan, C.W. and Mc Cleary, D.E. (1986), "Moment resistant connections and simple connections", PCI Specially Funded Research and Development Program, Research Project 1/4 Prestressed Concrete Institute, Chicago, IL, USA.
|
17 |
Virdi, K.S. and Ragupathy, P. (1992), "Tests on precast concrete subframes with semi-rigid joints", Proceedings of the First State of the Art Workshop, COST C1, Strasbourg, October.
|
18 |
Yang, K.H., Oh, M.H., Kim, M.H. and Lee, H.C. (2010), "Flexural behaviour of hybrid precast concrete beams with H-steel beams at both ends", Eng. Struct., 32(9), 2940-2949.
DOI
|
19 |
Zoubek, B., Isakovic, T., Fahjan, Y. and Fischinger, M. (2013), "Cyclic failure analysis of the beam-to-column dowel connections in precast industrial buildings", Eng. Struct., 52, 179-191.
DOI
|
20 |
ACI 318 (2014), Building code requirements for structural concrete and commentary; American Concrete Institute, Farmington Hills, MI, USA.
|
21 |
Anderson, D., Colson, A. and Jaspart, J.P. (1993), "Connections and frame design for economy", New Steel Construction, 30-33.
|
22 |
Bhatt, P. and Kirk, D.W. (1985), "Tests on improved beam-tocolumn connections for precast concrete", ACI Journal, 82(6), 835-843.
|
23 |
BS 5950 (1985), The Structural use of steelwork in building, British Standards Institute; London, UK.
|
24 |
BS 8110 (1985), The structural use of concrete, British Standards Institute; London, UK.
|
25 |
Chefdebien, A. and Dardare, J. (1994), "Experimental investigations on current connections between precast concrete components", COST C1 Proceedings of the 2nd, Workshop, Semi-rigid Behaviour of Civil Engineering Structural Connections, Prague, Czech Republic, October.
|
26 |
Cheok, G.S. and Lew, H.S. (1991), "Performance of precast concrete beam-to-column connections subject to cyclic loading", PCI Journal, 36(3), 56-67.
|
27 |
Cheok, G.S. and Lew, H.S. (1993), "Model precast concrete beam-to-column connections subject to cyclic loading", PCI Journal, 38(4), 80-92.
DOI
|
28 |
Cheok, G.S., Stone, W.C. and Kunnath, S.K. (1998), "Seismic response of precast concrete frames with hybrid connections", ACI Struct. J., 95(2), 527-539.
|
29 |
Choi, H.K., Choi, Y.C. and Choi, C.S. (2013), "Development and testing of precast concrete beam-to-column connections", Eng. Struct., 56, 1820-1835.
DOI
|
30 |
Comair, F. and Dardare, J. (1992), "Model testing of precast semirigid beam-column connection", Proceedings of the First State of the Art Workshop, COST C1, Strasbourg, France, October.
|
31 |
Demartino, C., Monti, G. and Vanzi, l. (2017), "Seismic loss-of-support conditions of frictional beam-to-column connections", Struct. Eng. Mech., Int. J., 61(4), 527-538.
DOI
|
32 |
Dolan, C.W. and Pessiki, S.P. (1989), "Model testing of precast concrete connections", PCI Journal, 56(2), 85-103.
|
33 |
Dolan, C.W., Stanton, J.F. and Anderson, R.G. (1987), "Moment resistant connections and simple connections", PCI Journal, 32(2), 62-74.
DOI
|
34 |
Elliott, K.S. (2017), Precast Concrete Structures, (2nd Edition), Boca Raton: Taylor & Francis Group, CRC Press, New York, NY, USA.
|
35 |
Elliott, K.S., Davies, G., Gorgun, H. and Adlparvar, M.R. (1998), "The stability of precast concrete skeletal structures", PCI Journal, 43(2), 42-60.
DOI
|
36 |
Elliott, K.S., Davies, G., Marcelo, F., Gorgun, H. and Mahdi, A.A. (2003), "Can precast concrete structures be designed as semirigid frames? Part 1 - The experimental evidence", Struct. Engr., 81(16), 14-27.
|
37 |
Englekrik, R.E. (1995), "Development and testing of a ductile connector for assembling precast concrete beams and columns", PCI Journal, 40(2), 36-51.
DOI
|
38 |
Ertas, O., Ozden, S. and Ozturan, T. (2006), "Ductile connections in precast concrete moment resisting frames", PCI Journal, 51(3), 66-76.
DOI
|
39 |
Eurocode 2 (2004), Design of Concrete Structures; European Committee for Standardization, Brussels, Belgium.
|
40 |
Gorgun, H. (1997), "Semi-rigid behaviour of connections in precast concrete structures", Ph.D. Thesis; University of Nottingham, Nottingham, UK.
|
41 |
Gorgun, H. and Yilmaz, S. (2012) "Geometrically nonlinear analysis of plane frames with semi-rigid connections accounting for shear deformations", Struct. Eng. Mech., Int. J., 44(4), 539-569.
DOI
|
42 |
Han, C., Li, Q., Wang, X. Jiang, W. and Li, W. (2016), "Research on rotation capacity of the new precast concrete assemble beam-column joints", Steel Compos. Struct., Int. J., 22(3), 613-625.
DOI
|
43 |
The Institution of Structural Engineers (1978), Structural joints in precast concrete; Manual. 11 Upper Belgrave Street, London SW1X 8BH, UK.
|
44 |
Kataoka, M.N., Ferreira, M.A. and El Debs, A.L.H.C. (2015), "Study on the behavior of beam-column connections in precast concrete structure", Comput. Concrete, Int. J.. 16(1), 163-178
DOI
|
45 |
Khaloo, A.R. and Parastesh, H. (2003), "Cyclic loading of ductile precast concrete beam-column connection", ACI Struct. J., 100(4), 291-296.
|