Shear transfer mechanism in connections involving concrete filled steel columns under shear forces  

De Nardin, Silvana (Department of Structural Engineering, University of Sao Paulo)
El Debs, Ana Lucia H.C. (Department of Civil Engineering, Federal University of Sao Carlos)
Publication Information
Steel and Composite Structures / v.28, no.4, 2018 , pp. 449-460 More about this Journal
Abstract
This paper reports the experimental results of three through bolt beam-column connections under pure shear forces using modified push-out tests. The investigated specimens include extended end-plates and six through-bolts connecting square concrete-filled steel tubular column (S-CFST) to steel beams. The main goal of this study is to investigate if and how the mechanical shear connectors, such as steel angles and stud bolts, contribute to the shear transfer mechanisms in the steel-concrete interface of the composite column. The contribution of shear studs and steel angles to improve the shear resistance of steel-concrete interface in through-bolt connections was investigated using tests. The results showed that their contribution is not significant when the beam-column connection is included in the push-out tests. The specimens failed by pure shear of the long bolts, and the ultimate load can be predicted using the shear resistance of the bolts under shear forces. The predicted values of load allowed obtaining a good agreement with the tests results.
Keywords
beam-to-column connection; shear forces; through-bolt connection; steel-concrete interface; mechanical connectors;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 Petrus, C., Abdul Hamid, H., Ibrahim, A. and Nyuin, J.D. (2011), "Bond strength in concrete filled built-up steel tube columns with tab stiffeners", Can. J. Civil Eng., 38(6), 627-637.   DOI
2 Qu, X., Chen, Z., Nethercot, D.A., Gardner, L. and Theofanous, M. (2013), "Load-reversed push-out tests on rectangular CFST columns", J. Constr. Steel Res., 81, 35-43.   DOI
3 Qu, X., Chen, Z., Nethercot, D.A., Gardner, L. and Theofanous, M. (2015), "Push-out tests and bond strength of rectangular CFST columns", Steel Compos. Struct., Int. J., 19(1), 21-41.   DOI
4 Shakir-Khalil, H. (1993a), "Pushout strength of concrete-filled steel hollow section tubes", Struct. Engr., 71(13), 230-243.
5 Shakir-Khalil, H. (1993b), "Resistance of concrete-filled steel tubes pushout force", Struct. Engr., 71(13), 234-243.
6 Shin, K.J., Kim, Y.J., Oh, Y.S. and Moon, T.S. (2004), "Behavior of welded CFT column to H-beam connections with external stiffeners", Eng. Struct., 26(13), 1877-1887.   DOI
7 Song, T.-Y., Tao, Z., Uy, B. and Han, L.-H. (2015), "Bond strength in full-scale concrete-filled steel tubular columns", Proceedings of the 2015 World Congress on Advances in Structural Engineering and Mechanics (ASEM 2015), Incheon, Korea, August, 11 p.
8 Van-Long, H., Jean-Pierre, J. and Jean-Francois, D. (2015), "Extended end-plate to concrete-filled rectangular column joint using long bolts", J. Constr. Steel Res., 113, 156-168.   DOI
9 Xu, C., Chengkui, H., Decheng, J. and Yuancheng, S. (2009), "Push-out test of pre-stressing concrete filled circular steel tube columns by means of expansive cement", Constr. Build. Mater., 23(1), 491-497.   DOI
10 ABNT (Brazilian Association of Technical Codes), NBR 8800 (2008), Design and execution of steel concrete composite building structures: Procedures. ABNT, Rio de Janeiro, Brazil. [In Portugues]
11 Araujo, C.M.S. (2009), "Study of the shear forces transfer in the connection between steel beams and concrete filled steel tube columns", Department of Structural Engineering, University of Sao Paulo at Sao Carlos, Sao Carlos, 166 p. [In Portuguese]
12 ASTM E 8M-00 (2000), Standard test methods for tension testing of metallic materials (metric), American Society for Testing and Materials, West Conshohocken, PA, USA.
13 Beutel, J., Thambiratnam, D. and Perera, N. (2001), "Monotonic behaviour of composite column to beam connections", Eng. Struct., 2(3), 1152-1161.
14 BS EN 1993-1-8 (2002), Design of steel structures, part 1.8: Design of joints, London, UK.
15 De Nardin, S. and El Debs, A.L.H.C. (2013), "State of the art on composite structures in Brazil", Proceedings of the ICE - Civil Engineering, 166(6), 20-27.
16 BS EN 1994-1-1 (2004), Design of composite steel and concrete structures, part 1.1: General rules and rules for building, London, UK.
17 Choi, S.M., Park, S.H., Yun, Y.S. and Kim, J.H. (2010), "A study on the seismic performance of concrete-filled square steel tube column-to-beam connections reinforced with asymmetric lower diaphragms", J. Constr. Steel Res., 66(7), 962-970.   DOI
18 De Nardin, S. and El Debs, A.L.H.C. (2004), "An experimental study of connections between I-beams and concrete filled steel tubular columns", Steel Compos. Struct., Int. J., 4(4), 303-315.   DOI
19 De Nardin, S. and El Debs, A.L.H.C. (2005), "An experimental study of the strength and stiffness of concrete-filled steel tubular column connections with weld and stiffener angles", Improvement of Buildings' Structural Quality by New Technologies: Proceedings of the Final Conference of COST Action C12, 20-22, CRC Press, Innsbruck, Austria, January.
20 De Nardin, S. and El Debs, A.L.H.C. (2007), "Shear transfer mechanisms in composite columns: an experimental study", Steel Compos. Struct., Int. J., 7(5), 377-390.   DOI
21 Johansson, M. (2003), "Composite action in connection regions of concrete-filled steel tube columns", Steel Compos. Struct., Int. J., 3(1), 47-64.   DOI
22 Mclellan, A.B. (1992), "Through bolt connections for composite columns", Thesis; University of British Columbia.
23 Mollazadeh, M.H. and Wang, Y.C. (2016), "New mechanism of load introduction into concrete-filled steel tubular columns", J. Struct. Eng., 142(6), 040160161-0401601613.
24 Parsley, M.A., Yura, J.A. and Jirsa, J.O. (2000), "Push-out behavior of rectangular concrete-filled steel tubes", ACI Special Publication, 196, 87-107.