Introducing a precast moment resistant beam-to-column concrete connection comparable with in-situ one  

Esmaeili, Jamshid (Department of Civil Engineering, University of Tabriz)
Ahooghalandary, Neyram (Department of Civil Engineering, University of Tabriz)
Publication Information
Computers and Concrete / v.23, no.3, 2019 , pp. 203-215 More about this Journal
Abstract
Precast reinforced concrete structure (PRCS) consists of prefabricated members assembled at worksites and has more connections limitations in comparison with the equivalent in-situ reinforced concrete structure (IRCS). As a result of these limitations, PRCSs have less ductility in comparison with IRCSs. Recent studies indicate that the most noticeable failure in PRCSs have occurred in their connection zone. The objective of this study is introducing a type of precast beam-to-column connection (PBC) which in spite of being simple is of the same efficiency and performance as in-situ beam-to-column connection (IBC). To achieve this, the performance of proposed new PBC at exterior joint of a four story PRCS was analyzed by pseudo dynamic analysis and compared with that of IBC in equivalent IRCS. Results indicated that the proposed connection has even better performance in terms of strength, energy dissipation and stiffness, than that of IBC.
Keywords
finite element analysis; precast connection; beam-to-column connection; precast structure;
Citations & Related Records
연도 인용수 순위
  • Reference
1 ACI 318-14 (2014), Building Code Requirements for Structural Concrete and Commentary, American Concrete Institute Committee, Farmington Hills, MI, USA.
2 ACI 374.1-05 (2005), Acceptance Criteria for Moment Frames Based on Structural Testing and Commentary, American Concrete Institute Committee, Farmington Hills, MI, USA.
3 Bradley, B.A., Dahkal, R.P., Mander, J.B. and Li, L. (2008), "Experimental multi-level seismic performance assessment of 3D RC frame designed for damage avoidance", Earthq. Eng. Struct. Dyn., 37(1), 1-20.   DOI
4 CEB-FIP Model Code (1990), Committee Euro-International du Beton, Bulletin Information, No. 195, Lausanne, Switzerland.
5 Chen, W.F. and Saleeb, A.F. (1982), Constitutive Equations for Engineering Materials, Wiley, New York, USA.
6 Cheng, C.T. (2008), "Seismic behaviour of post tensioned precast reinforced concrete beam-to-column connections", Comput. Concrete, 5(6), 525-544.   DOI
7 Kataoka, M.N., Ferreira, M.A. and EI Debs, A.L.H.C. (2015), "Study on the behaviour of beam-column connection in precast concrete structure", Comput. Concrete, 16(1), 163-178.   DOI
8 Kupfer, H.B. and Gerstle, K.H. (1973), "Behaviour of concrete under biaxial stress", ASCE J. Eng. Mech. Div., 99(4), 853-866.   DOI
9 Fan, L. and Lu, X. (2008), "Investigation on seismic behaviour of jointed precast concrete frame structures", The 14 World Conference on Earthquake Engineering, Bejing, China, October.
10 Choi, H., Choi, Y. and Choi, C. (2013), "Development and testing of precast concrete beam-to-Column connections", Eng. Struct., 56, 1820-1835.   DOI
11 Ghayeb, H.H., Razak, H.A. and Sulong, N.H.R. (2017), "Development and testing of hybrid precast concrete beam to column connection under cyclic loading", Constr. Build. Mater., 151, 258-278.   DOI
12 Guan, D., Guo, Z., Xiao, Q. and Zheng, Y. (2016), "Experimental study of a new beam-to-column connection for precast concrete frames under reversal cyclic loading", Adv. Struct. Eng., 19(3), 529-545.   DOI
13 Hawileh, R.A., Rahman, A. and Tabatabai, H. (2010), "Nonlinear finite analysis and modelling of a precast hybrid beam-column connection subjected to cyclic loads", Appl. Math. Model., 34(9), 2562-2583.   DOI
14 Hong, W., Kim, S., Park, S., Kim, J., Lee, S., Yoon, K. and Kim, S. (2010), "Composite beam composed of steel and precast concrete (modularized hybrid system)", Struct. Des. Tall Spec. Build., 19, 707-727.
15 Hordijk, D.A. (1991), "Local approach to fatigue of concrete", Ph.D. Dissertation, Delft University of Technology, Delft, Netherlands.
16 Im, H., Park, H. and Eom, T. (2013), "Cyclic loading test for reinforced-concrete-emulated beam-column connection of precast concrete moment frame", ACI Struct. J., 110(1), 115-125.
17 Rodriguez, M.E. and Torres, M.M. (2013), "Seismic behaviour of a type of welded precast concrete beam-to-column connection", PCI J., 73(3), 81-94.   DOI
18 Lee, H.J. and Yu, S.Y. (2009), "Cyclic response of exterior beamcolumn joints with different anchorage methods", ACI Struct. J., 106(3), 329-339.
19 Maya, L., Zanuy, C., Albajar, L., Lopez, C. and Portabella, J. (2013), "Experimental assessment of connections for precast concrete frames using ultra high performance fiber reinforced concrete construction", Constr. Build. Mater., 48, 173-186.   DOI
20 PCI Hand Book (2010), Precast and Prestressed Concrete Institute, Design Handbook, PCI Industry Handbook Committee, Chicago, IL, USA.
21 Standard No. 2800 (2014), Iranian Code of Practice for Seismic Resistant Design of Buildings, Iranian Building Codes and Standards, Tehran, Iran.
22 Van Mier, J.G.M. (1986), "Multi-axial strain-softening of concrete, part I: fracture, part II: load histories", Mater. Struct., 19(111), 179-191.   DOI