Browse > Article
http://dx.doi.org/10.12989/cac.2014.13.5.659

Bayesian updated correlation length of spatial concrete properties using limited data  

Criel, Pieterjan (Ghent University, Department of Structural Engineering, Magnel Laboratory for Concrete Research)
Caspeele, Robby (Ghent University, Department of Structural Engineering, Magnel Laboratory for Concrete Research)
Taerwe, Luc (Ghent University, Department of Structural Engineering, Magnel Laboratory for Concrete Research)
Publication Information
Computers and Concrete / v.13, no.5, 2014 , pp. 659-677 More about this Journal
Abstract
A Bayesian response surface updating procedure is applied in order to update the parameters of the covariance function of a random field for concrete properties based on a limited number of available measurements. Formulas as well as a numerical algorithm are presented in order to update the parameters of response surfaces using Markov Chain Monte Carlo simulations. The parameters of the covariance function are often based on some kind of expert judgment due the lack of sufficient measurement data. However, a Bayesian updating technique enables to estimate the parameters of the covariance function more rigorously and with less ambiguity. Prior information can be incorporated in the form of vague or informative priors. The proposed estimation procedure is evaluated through numerical simulations and compared to the commonly used least square method.
Keywords
Bayesian updating techniques; random fields; concrete properties; covariance function; variogram; Markov chain Monte Carlo simulations;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Hastings, W.K. (1970), "Monte Carlo sampling methods using Markov chains and their applications", Biometrika, 57(1), 97-109.   DOI   ScienceOn
2 Gregory, P. (2005), Bayesian Logical Data Analysis for the Physical Sciences: A Comparative Approach with $Mathematica^{(R)}$ Support: Cambridge University Press.
3 Griffiths, D., Fenton, G. and Manoharan, N. (2002), Bearing Capacity of Rough Rigid Strip Footing on Cohesive Soil: Probabilistic Stud, J. Geotech. Geoenviron. Eng., 128(9), 743-755.   DOI
4 Griffiths, D.V., Huang, J. and Fenton, G.A. (2011), "Probabilistic infinite slope analysis", Comput. Geotech., 38(4), 577-584.   DOI
5 Kessler, S., Huber, M., Straub, D., Gehlen, C. and Moormann, C. (2010), Stochastic Evaluation of Active Corroding Areas in Concrete Structures, Paper presented at the 8th International Probabilistic Workshop, Szczecin.
6 Lee, P.M. (2012), Bayesian Statistics: An Introduction: Wiley.
7 Li, Y. (2004), Effect of Spatial Variability on Maintenance and Repair Decisions for Concrete Structures. Delft University Press.
8 Liu, J.S. (2008), Monte Carlo Strategies in Scientific Computing: Springer.
9 Mantoglou, A. and Wilson, J.L. (1982), "The Turning Bands Method for simulation of random fields using line generation by a spectral method, Water Resour. Res., 18(5), 1379-1394.   DOI
10 Matheron, G. (1962), Traite de geostatistique appliquee (Vol. 14), Editions Technip.
11 Matheron, G. (1973), "The itrinsic rndom fnctions and their aplications", Adv. Appl. Prob., 5(3), 439-468.   DOI   ScienceOn
12 Most, T. and Bucher, C. (2006), Stochastic simulation of cracking in concrete structures using multiparameter random fields, Int. J. Reliab. Safety, 1(1/2), 168-187.   DOI
13 Baecher, G.B. and Christian, J.T. (2003), Reliability and statistics in geotechnical engineering: John Wiley & Sons.
14 Most, T. and Bucher, C. (2007), Probabilistic analysis of concrete cracking using neural networks and random fields, Prob. Eng. Mech., 22(2), 219-229.   DOI
15 Nicholas, M., Arianna, W.R., Marshall, N.R., Augusta, H.T. and Edward, T. (1953), "Equation of State Calculations by Fast Computing Machines", J. Chem. Phys., 21(6), 1087-1092.   DOI
16 Cressie, N.A.C. (1993), Statistics for spatial data: J. Wiley.
17 Box, G.E.P. and Tiao, G.C. (1992), Bayesian inference in statistical analysis: Wiley.
18 Caspeele, R. and Taerwe, L. (2013), "Numerical Bayesian updating of prior distributions for concrete strength properties considering conformity control", Adv. Concrete Construct., 1(1), 85-102.   DOI
19 Duprat, F. (2007), "Reliability of RC beams under chloride-ingress", Construct. Build. Mater., 21(8), 1605-1616.   DOI
20 Emery, X. and Cornejo, J. (2010), "Truncated Gaussian simulation of discrete-valued, ordinal coregionalized variables", Comput. Geosci., 36(10), 1325-1338.   DOI
21 Emery, X. and Lantuejoul, C. (2006), "TBSIM: A computer program for conditional simulation of threedimensional Gaussian random fields via the turning bands method", Comput. Geosci., 32(10), 1615-1628.   DOI   ScienceOn
22 Engelund, S. (1997), Probabilistic Models and Computational Methods for Chloride Ingress in Concrete. . Aalborg University, Aalborg
23 Ghosh, J.K., Delampady, M. and Samanta, T. (2010), An Introduction to Bayesian Analysis: Theory and Methods: Springer.
24 Fenton, G. (1994), "Error evaluation of three random field generators", J. Eng. Mech., 120(12), 2478-2497.   DOI
25 Gamerman, D. and Lopes, H.F. (2006), Markov Chain Monte Carlo: Stochastic Simulation for Bayesian Inference, Second Edition: Taylor & Francis.
26 Gelman, A., Carlin, J.B., Stern, H.S. and Rubin, D.B. (2003), Bayesian Data Analysis: Chapman & Hall/CRC.
27 Stewart, M.G. and Mullard, J.A. (2007), "Spatial time-dependent reliability analysis of corrosion damage and the timing of first repair for RC structures", Eng. Struct., 29(7), 1457-1464.   DOI   ScienceOn
28 Perrin, F.S., Pendola, M. and De Rocquigny, E. (2007), Comparison of Markov chain Monte Carlo simulation and FORM-based approach for Bayesian updating of mechanical models. Paper presented at the 10th int. Conf. on Applications of Statistics and Probaility in Civil Engineering, Tokyo.
29 Robert, C. and Casella, G. (2010), Monte Carlo Statistical Methods: Springer.
30 Santoso, A.M., Phoon, K.K. and Quek, S.T. (2011), Modified Metropolis-Hastings algorithm with reduced chain correlation for efficient subset simulation, Prob.Eng. Mech., 26(2), 331-341.   DOI   ScienceOn
31 Straub, D. (2011), Reliability updating with inspection and monitoring data in deteriorating reinforced concrete slabs. Paper presented at the Application of Statistics and Probability in Civil Engineering, London.
32 Vasconcellos Real, M.D., Filho, A.C. and Maestrini, S.R. (2003), "Response variability in reinforced concrete structures with uncertain geometrical and material properties", Nuclear Eng. Des., 226(3), 205-220.   DOI   ScienceOn
33 Straub, D. and Fischer, J. (2011), Reliability Assessment of Corroding Reinforced Concrete Slabs with Inspection Data. Paper presented at the 9th International Probabilistic Workshop, TU Braunschweig, germany.
34 Trefethen, L.N. and Bau, D. (1997), Numerical Linear Algebra: SIAM.
35 Vanmarcke, E. (2010), Random Fields: Analysis and Synthesis: World Scientific.
36 Vu, K.A.T. (2003), Corrosion-induced cracking and spatial timedependent reliability analysis of reinforced concrete structures, The University of Newcastle, New South Wales, Australia.
37 Van Der Vurst, F., Caspeele, R., Desnerck, P., Schutter, G.D. and Peirs, J. (2014), Modification of existing shape factor models for self- compacting concrete strength by means of Bayesian updating techniques, Materials and Structures.
38 Firouzi, A. and Rahai, A.R. (2011), Prediction of extent and liklihood of corrosion-induced cracking in reinforced concrete bridge decks, Int. J. Civil Eng., 9(3), 183-192.