1 |
Oguejiofor, E.C. and Hosain, M.U. (1997), "Numerical analysis of push-out specimens with perfobond rib connectors", Comput. Struct., 62(4), 617-624.
DOI
|
2 |
Ranzi, G., Bradford, M.A. and Uy, B. (2004), "A direct stiffness analysis of a composite beam with partial interaction", Int. J. Numer. Meth. Eng., 61(5), 657-672.
DOI
|
3 |
Rodrigues, J.P.C. and Laim, L. (2014), "Experimental investigation on the structural response of T, T-block and TPerfobond shear connectors at elevated temperatures", Eng. Struct., 75, 299-314.
DOI
|
4 |
Taira, Y., Furuichi, K., Yamamura, M. and Tominaga, T. (1998), "Experimental research on fundamental characteristics of perfobond connector", Proc. JCI, 20(3), 859-864.
|
5 |
Tanaka, T., Sakai, J. and Kawano, A. (2013), "Development of new mechanical shear connector using burring steel plate", J. Struct. Constr. Eng., 78(694), 2237-2245.
DOI
|
6 |
Xue, D., Liu, Y., He, J. and Ma, B. (2011), "Experimental study and numerical analysis of a composite truss joint", J. Constr. Steel Res., 67(6), 957-964.
DOI
|
7 |
Zellner, W. (1987), "Recent designs of composite bridges and a new type of shear connectors", Proceedings of the ASCE Engineering Foundation Conference on Composite Construction, Henniker, U.S.A., June.
|
8 |
Medberry, S.B. and Shahrooz, B.M. (2002), "Perfobond shear connector for composite construction", Eng. J., 39(1), 2-12.
|
9 |
Zheng, S., Liu, Y., Yoda, T. and Lin, W. (2016a), "Parametric study on shear capacity of circular-hole and long-hole perfobond shear connector", J. Constr. Steel Res., 117, 64-80.
DOI
|
10 |
Zheng, S., Liu, Y., Yoda, T. and Lin, W. (2016b), "Shear behavior and analytical model of perfobond connectors", Steel Compos. Struct., 20(1), 71-89.
DOI
|
11 |
Nishiumi, K., Tominaga, T., Muroi, S. and Furuichi, K. (1998), "Experimental study on shear connectors using perforated plate under the confinement", Proc. JCI, 20(3), 865-870.
|
12 |
Eurocode (2004), Design of Composite Steel and Concrete Structures. Part 1-1: General Rules and Rules for Buildings, Brussels, Belgium.
|
13 |
Al-Darzi, S.Y.K., Chen, A.R. and Liu, Y.Q. (2007), "Finite element simulation and parametric studies of perfobond rib connector", Am. J. Appl. Sci., 4(3), 122-127.
DOI
|
14 |
Cândido-Martins, J.P.S., Costa-Neves, L.F. and Vellasco, P.C.G.S. (2010), "Experimental evaluation of the structural response of perfobond shear connectors", Eng. Struct., 32(8), 1976-1985.
DOI
|
15 |
Dogan, O. and Roberts, T.M. (2012), "Fatigue performance and stiffness variation of stud connectors in steel-concrete-steel sandwich systems", J. Constr. Steel Res., 70(2), 86-92.
DOI
|
16 |
Furuichi, K., Taira, Y. and Yamamura, M. (1998), Experimental Study on Shear Strength of Shear Connectors Using Perforated Plate, Report No. 46, Kajima Technical Research Institute, Kajima, Japan.
|
17 |
Furuuchi, H., Ueda, T., Suzuki, O. and Taguchi, H. (2005), "A study on shear transfer capacity of perfobond strip", Proceedings of the 6th Symposium on Development of Hybrid Structures, Tokyo, Japan, November.
|
18 |
Hosaka, T., Mitsuki, K., Hiragi, H., Ushijima, Y., Tachibana, Y. and Watanabe, H. (2000), "An experimental study on shear characteristics of perfobond strip and its rational strength equations", J. Struct. Eng., 46A, 1593-1604.
|
19 |
He, J., Liu, Y., Chen, A. and Yoda, T. (2010), "Experimental study on inelastic mechanical behaviour of composite girders under hogging moment", J. Constr. Steel Res., 66(1), 37-52.
DOI
|
20 |
Himukai, M., Fujii, K. and Fukada, K. (2007), "Ultimate slip behavior of double-lined perfobond rib connector", J. Struct. Eng., 53A, 1089-1098.
|
21 |
Kim, H.Y. and Jeong, Y.J. (2006), "Experimental investigation on behaviour of steel-concrete composite bridge decks with perfobond ribs", J. Constr. Steel Res., 62(5), 463-471.
DOI
|
22 |
Kim, S.H., Park, S., Kim, K.S. and Jung, C.Y. (2017), "Generalized formulation for shear resistance on Y-type perfobond rib shear connectors", J. Constr. Steel Res., 128, 245-260.
DOI
|
23 |
Leonhardt, F., Andra, W., Andra, H.P. and Harre, W. (1987), "New, improved bonding means for composite loadbearing structures with high fatigue strength", Beton-Und Stahlbetonbau, 82(12), 325-331.
DOI
|
24 |
Lin, Z., Liu, Y. and Roeder, C.W. (2016), "Behavior of stud connections between concrete slabs and steel girders under transverse bending moment", Eng. Struct., 117, 130-144.
DOI
|
25 |
Liu, R. and Liu, Y. (2015), "Analysis of auxiliary ribs in steelconcrete joint of hybrid girder", J. Constr. Steel Res., 112, 363-372.
DOI
|
26 |
Lorenc, W., Kożuch, M. and Rowinski, S. (2014a), "The behaviour of puzzle-shaped composite dowels-part I: Experimental study", J. Constr. Steel Res., 101, 482-499.
DOI
|
27 |
Lorenc, W., Kożuch, M. and Rowinski, S. (2014b), "The behaviour of puzzle-shaped composite dowels-part II: Theoretical investigations", J. Constr. Steel Res., 101, 500-518.
DOI
|
28 |
Ahn, J.H., Lee, C.G., Won, J.H. and Kim, S.H. (2010), "Shear resistance of the perfobond-rib shear connector depending on concrete strength and rib arrangement", J. Constr. Steel Res., 66(10), 1295-1307.
DOI
|