Browse > Article
http://dx.doi.org/10.12989/sem.2018.65.2.203

An experimental study on the development and verification of NCC(new concrete cutting) system  

Park, Jong-Hyup (Technical Research institute, Ok Dang Industry Co., Ltd)
Han, Jong-Wook (Hybrid Structural Test Center, Myong-Ji University)
Publication Information
Structural Engineering and Mechanics / v.65, no.2, 2018 , pp. 203-211 More about this Journal
Abstract
This paper introduces the development process of NCC(New Concrete Cutting) system and analyzes first verification test. Based on the first verification test results, some problems of NCC system have been newly modified. We carry out the second verification test. We tried to verify cutting performance and dust control efficiency of NCC system through the cutting test of concrete bridge piers. In particular, this verification test strives to solve the problem of concrete dust, which is the biggest problem of dry cutting method. The remaining dust problems in cutting section tried to solve through this verification test. This verification test of the NCC system shows that the dust problem of dry cutting method is closely controlled and solved. In conclusion, the proposed NCC method is superior to the dry cutting method in all aspects, including cutting performance, dust vacuum efficiency and cooling effect. The proposed NCC system is believed to be able to provide eco-friendly cutting technology to various industries, such as the removal of the SOC structures and the dismantling of nuclear plants, which have recently become a hot issue in the field of concrete cutting.
Keywords
concrete cutting; NCC method; water-cooled cutting; dry cutting; dust vacuum efficiency; temperature;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Husqvarna (2010), Cutting Methods Using a Minimum of Water with Efficient Recovery of Dust and Slurry, Professional Demolition International, IACDS Bauma 2010 Seminar.
2 International Atomic Energy Agency (2006), Dismantling of Contaminated Stacks at Nuclear Facilities, Technical Reports Series, No.440.
3 Rule, K., Perry, E. and Parsells, R. (2003), Diamond Wire Cutting of the Tokamak Fusion Test Reactor, The U.S. Department of Energy, PPPL-3776, January.
4 Korean Institute of Construction and Transporting Technology Evaluation and Planning (2005), Advanced Demolition Technologies for Eco-Friendly Urban Regeneration, Korea Land and Housing Corporation Research Report, February.
5 Figueira, M., Bobrovnitchii, G. and Pinatti, D.G. (2003), "A new route to process diamond wires", Mater. Res., 6(3), 327-333.   DOI
6 Park, J.H. and Lim, M.G. (2017), "An experimental study on the development of new diamond wire saw cutting system of concrete structure", J. Appl. Eng. Res., 12(3), 297-304.
7 U.S. Department of Energy (1998), Liquid Nitrogen Cooled Diamond-Wire Concrete Cutting, Innovative Technology Summary Report, DOE/EM-0392.
8 Han, J.S. (2006), Case Studies on Structure Demolition Work Personally Experienced at the Site of Cheonggyecheon Elevated Structures, Seoul City Headquarters of Cheonggyecheon Restoration Promotion.