1 |
Ghaboussi, J., Yun, G.J. and Hashash, Y.M.A. (2004), "A novel predictor-corrector algorithm for substructure pseudo dynamic testing", Earthq. Eng. Struct. Dyn., 35, 453-476
DOI
ScienceOn
|
2 |
Kwon, O.S., Nakata, N., Elnashai, A.S. and Spencer, B. (2005), "A framework for multi-site distributed simulation and application to complex structural systems", J. Earthq. Eng., 9(5), 741-753
DOI
|
3 |
Mahin, S.A. and Shing, P.B., (1985), "Pseudodynamic method for seismic testing", J. Struct. Eng. ASCE. 111(7), 1482-1503
DOI
ScienceOn
|
4 |
Schellenberg, A., Stojadinovic, B. and Mahin, S. (2006), The -NEES Hybrid Simulation Setup. Department of Civil and Environmental Engineering, University of California at Berkeley
|
5 |
Wang, T., Nakashima, M. and Pan, P. (2006), "On-line hybrid test combining with general-purpose finite element software", Earthq. Eng. Struct. Dyn., 35, 1471-1488
DOI
ScienceOn
|
6 |
Tsai, K., Hsieh, S., Yang, Y., Wang, K., Wang, S., Yeh, C., Cheng, W., Hsu, C. and Huang, S. (2003), Network Platform for Structural Experiment and Analysis (I). NCREE-03-021, National Center for Research on Earthquake Engineering, Taiwan
|
7 |
Zhang, J. and Makris, N. (2002), "Seismic response analysis of highway overcrossings including soil structure interaction", Earthq. Eng. Struct. Dyn., 31, 1967-1991
DOI
ScienceOn
|
8 |
Watanabe, E., Sugiura, K., Nagata, K., Yamaguchi, T. and Niwa, K. (1999), "Multi-phase interaction testing system by means of the internet", Proceedings of 1st International Conference on Advances in Structural Engineering and Mechanics, Seoul, Korea, 43-54
|
9 |
Watanabe, E., Kitada, T., Kunitomo, S. and Nagata, K. (2001), "Parallel pseudodynamic seismic loading test on elevated bridge system through the Internet", The Eight East Asia-Pacific Conference on Structural Engineering and Construction, Singapore, December 2001
|
10 |
Vecchio, F.J. and Wong, P. (2003), VecTor2 and FormWorks Manual. http://www.civ.utoronto.ca/vector/
|
11 |
Vecchio F.J. and Collins M.P. (1986), "The modified compression field theory for reinforced concrete elements subjected to shear", ACI Struct. J., 83(2). 219-231
|
12 |
Filip, C. Filippou and Margarita Constantinides (2004), "FEDEASLab getting started guide and simulation examples", Technical Report NEESgrid-2004-22
|
13 |
Hakuno, M., Shidawara, M. and Hara, T. (1969), "Dynamic destructive test of a cantilever beam, controlled by an analog-computer", Trans. Japan Soc. Civil Eng., 171, 1-9
|
14 |
Hibbit, Karlsson and Sorensen (2001), ABAQUS Theory Manual. Version 6.2
|
15 |
Gehrig, D. (2004), Guide to the NEESgrid Reference Implementation, Technical Report NEESgrid-2004-04
|
16 |
Dimig, J., Shield, C., French, C., Bailey, F. and Clark, A. (1999), "Effective force testing: A method of seismic simulation for structural testing", J. Struct. Eng., 125(9), 1028-1037
DOI
|
17 |
Elnashai, A.S., Papanikolaou, V. and Lee, D. (2002), "Zeus NL - A system for inelastic analysis of structures", Mid-America Earthquake Center, University of Illinois at Urbana-Champaign, Program Release Sept.
|
18 |
Combescure, D. and Pegon, P. (1997), "-Operator Splitting time integration technique for pseudodynamic testing. Error propagation analysis", Soil Dyn. Earthq. Eng., 16, 427-443
DOI
ScienceOn
|
19 |
Darby, A. P., Blakeborough, A. and Williams, M. S. (2001), "Improved control algorithm for real-time substructure testing", Earthq. Eng. Struct. Dyn., 30(3), 431-448
DOI
ScienceOn
|
20 |
Dermitzakis, S.N. and Mahin, S.A. (1985), "Development of substructuring techniques for on-line computer controlled seismic performance testing", Report UCB/EERC-85/04, Earthquake Engineering Research Center, University of California, Berkeley
|
21 |
Carrion, J. and Spencer, B.F. (2006), "Real-time hybrid testing using model-based delay compensation", Proceedings of 4th International Conference on Earthquake Engineering, Taipei, Taiwan, October 12-13
|
22 |
Chen, C.-H., Lai, W.-C., Cordova, P., Deierlein, G.G. and Tsai, K.-C. (2003), "Pseudo-dynamic test of full-scale RCS frame: Part 1 - Design, construction and testing", Proceedings of International Workshop on Steel and Concrete Composite Constructions, Taipei, Taiwan, 107-118
|
23 |
Chen, C. and Ricles, J.M. (2006), "Effective force testing method using virtual mass for real-time earthquake simulation", Proceedings of the 8th U.S. National Conference on Earthquake Engineering, San Francisco, CA, April, 2006
|
24 |
National Science Foundation (NSF), 2000. Network for earthquake engineering simulation (NEES): System Integration, Program Solicitation. Report NSC00-7, U.S.A.
|
25 |
McKenna, F. and Fenves, G.L. (2001), "The OpenSees command language manual, version 1.2", Pacific Earthquake Engineering Research Center, University of California at Berkeley
|
26 |
Mosqueda, G. (2003), Continuous Hybrid Simulation with Geographically Distributed Substructures, Ph.D. Dissertation, Department of Civil and Environmental Engineering, University of California, Berkeley
|
27 |
Nakashima, M. and Kato, H. (1987), "Experimental error growth behavior and error growth controlin on-line computer test control method", Building Research Institute, BRI-Report No. 123, Ministry of Construction, Tsukuba, Japan, 1987
|
28 |
Nakashima, M., Kato, H. and Takaoka, E. (1992), "Development of real-time pseudo dynamic testing", Earthq. Eng. Struct. Dyn., 21(1), 79-92
DOI
|
29 |
Molina, F.J., Verzeletti, G., Magonette, G., Buchet, P. and Geradin, M. (1999), "Bi-directional pseudodynamic test of a full-size three-story building", Earthq. Eng. Struct. Dyn., 28, 1541-1566
DOI
|
30 |
Horiuchi, T., Inoue, M., Konno, T. and Namita, Y. (1999), "Real-time hybrid experimental system with actuator delay compensation and its application to a piping system with energy absorber", Earthq. Eng. Struct. Dyn., 28(10), 1121-1141
DOI
|
31 |
Jeong, S.H. and Elnashai, A.S. (2005), "Analytical assessment of an irregular RC frame for full-scale 3D pseudo-dynamic testing. Part I: Analytical model verification", J. Earthq. Eng., 9(1), 95-128
DOI
|
32 |
Negro, P., Pinto, A.V., Verzeletti, G. and Magonette, G.E. (1996), "PsD test on four-story R/C building designed according to eurocodes", J. Struct. Eng., 122(12), 1409-1471
DOI
ScienceOn
|
33 |
Pan, P., Tada, M. and Nakashima, M. (2005), "Online hybrid test by internet linkage of distributed test-analysis domains", Earthq. Eng. Struct. Dyn., 34, 1407-1425
DOI
ScienceOn
|
34 |
Takanashi, K., Udagawa, K., Seki, M., Okada, T. and Tanaka, H. (1975), "Nonlinear earthquake response analysis of structures by a computer-actuator on-line system", Bull. of Earthquake Resistant Structure Research Centre, No.8, Institute of Industrial Science, University of Tokyo, Japan, 1975
|
35 |
Pinho, R. and Elnashai, A.S. (2000), "Dynamic collapse testing of a full-scale four story RC frame", ISET J. Earthq. Tech., 37(4), 143-163
|
36 |
Pearlman, L., D'Arcy, M., Johnson, E., Kesselman, C. and Plaszczak, P. (2004), "NEESgrid Teleoperation Control Protocol (NTCP)", Technical Report NEESgrid-2004-23, http://it.nees.org/
|
37 |
Takanashi , K. and Ohi, K. (1983), "Earthquake response analysis of steel structures by rapid computer-actuator on-line system, (1) a progress report, trial system and dynamic response of steel beams", Bull. Earthquake Resistant Struct. Research Center (ERS), Inst. of Industrial Sci., Univ. of Tokio, Tokio, Japan, 16, 103-109
|
38 |
Takahashi, Y. and Fenves, G.L. (2006), "Software framework for distributed experimental-computational simulation of structural systems", Earthq. Eng. Struct. Dyn., 35, 267-291
DOI
ScienceOn
|
39 |
Shing, B., Vannan, M.T. and Cater, E. (1991), "Implicit time integration for pseudodynamic tests", Earthq. Eng. Struct. Dyn., 20, 551-576
DOI
|
40 |
Spencer Jr., B.F., Elnashai, A., Kuchma, D., Kim, S., Holub, C. and Nakata, N. (2006b), Multi-Site Soil- Structure-Foundation Interaction Test (MISST). University of Illinois at Urbana-Champaign
|
41 |
Shing, B. and Manivannan, T. (1990), "On the accuracy of an implicit algorithm for pseudodynamic tests", Earthq. Eng. Struct. Dyn., 19, 631-651
DOI
|