1 |
ACI 318-02 (2002), ' Building code requirements for reinforced concrete and commentary ', American Concrete Institute, Detroit
|
2 |
AASHTO (1992),' Standard specifications for highway bridges ' 15th. Edition, Washington.
|
3 |
Kaufman, M.K. and Ramirez,J.A. (1988),' Re-evaluation of the ultimate shear behavior using high-strength concrete prestressed I-beams ', ACI Struct. J., 85(3), May-June, 295-303
|
4 |
Price, K.M. and Edwards, A.D. (1971), ' Fatigue strength in shear of prestressed concrete I-beams ', ACl J., 67(10), April, 282-292
|
5 |
Labia, Y, Saiidi, M. and Douglas, B. (1997),' Full-scale testing and analysis of 20-year old pretensioned concrete box girders ', American Concrete Institute, Struct. J., 94(5), September-October, 471-482
|
6 |
Shahawy, M. and Batchelor, B. (1996), ' Shear behavior of full-scale prestressed concrete girders: Comparison between AASHTO specifications and LRFD code ', PCl J., 41(3), May-June, 96-102
|
7 |
Maruyama, K. and Rizkalla, S.H. (1988), ' Shear design consideration for pretensioned prestressed beams ', ACI Struct. J., 85(5), Sept.-Oct., 492-498
|
8 |
Ramirez, J.A. and Breen, J.E. (1991), ' Evaluation of a modified truss-model approach for beams in shear ', ACI Struct. J., 88(5), May, 562-571
|
9 |
Saiidi, M., Labia, Y. and Douglas, B. (2000), ' Repair and fatigue performance of a full-scale pretensioned concrete box girder ', PCI J., Precast/Prestressed Concrete Institute, 45(2), March-April, 96-105
|
10 |
Teng, S., Ma, W. and Wang, F. (2000), ' Shear strength of concrete deep beam under fatigue loading ', American Concrete Institute, Struct. J., 97(4), July-August, 572-580
|
11 |
Buzick, A. and Saiidi, M. (1999), ' Shear strength and shear fatigue behavior of full-scale prestressed concrete box girders ', CCEER-99-4, Civil Engineering Department, University of Nevada at Reno, April, 126 pp
|
12 |
Hanson,J.M. and Hulsbos, C.L. (1965), 'Fatigue tests of two prestressed concrete I-beams with inclined cracks ', Highway Research Record 103, Highway Research Board, January, 14-30
|
13 |
Collins, M.P. and Mitchell, D. (1991), Prestressed Concrete Structures, Prentice-Hall, Inc.
|
14 |
Elzanaty, A.H., Nilson, A.H. and Slate O.F. (1986), ' Shear capacity of prestressed concrete beams using highstrength concrete, ' ACI J., 83(3), May-June, 359-368
|
15 |
Gregor, T. and Collins, M.P. (1995), ' Tests of large partially prestressed concrete girders ', ACI Struct. J, 92(1), Jan.-Feb., 63-72
|
16 |
Hanson, J.M., Hulsbos, C.L. and Van Hom, D.A. (1970), ' Fatigue tests of prestressed concrete I-beams ', Proc., American Society of Civil Engineers, J. Struct. Div., 96(STll), November, 2443-2464
|
17 |
Kreger, M.E., Bachman, P.M. and Breen, J.E. (1989), 'An expIatory study of shear fatigue behavior of prestressed concrete girders ', PCI J., 34(4), July-August, 105-124ct
|
18 |
AASHTO (1998),' LRFD bridge specifications, second edition ', American Association of State Highway and Transportation Officials, Washington
|
19 |
AASHTO (1965), ' Standard specifications for highway bridges ', 9th. Edition, Washington
|