Numerical study of stress states near construction joint in two-plate-girder bridge with cast-in-place PC slab |
Yamaguchi, Eiki
(Department of Civil Engineering, Kyushu Institute of Technology)
Fukushi, Fumio (Japan Steel Tower Co. Ltd.) Hirayama, Naoki (Department of Civil Engineering, Kyushu Institute of Technology) Kubo, Takemi (Japan Steel Tower Co. Ltd.) Kubo, Yoshinobu (Department of Civil Engineering, Kyushu Institute of Technology) |
1 | Hibbitt, Karlsson and Sorensen, Inc. (1995), ABAQUS/Standard User's Manual. Ver.5.5 |
2 | Japan Road Association (2002), Specifications for Highway Bridges Part I: Common Part. Maruzen, Tokyo |
3 | Nakazono, A, Yasukawa, Y., Inaba, N., Sakamoto, S., Ohgaki, K. and Saito, H. (2002), 'Design of a continuous composite two-girder bridge with PC slab', Bridge and Foundation Engineering, 36(4), 33-39 |
4 | Ohgaki, K., Sakukawa, K., Tamura. Y, Yamamoto, A., Kubo, T and Kawajiri, K. (1998), 'A study on jack-updown method for slabs by center support of a continuous composite twin I-girder bridge', Proc. of Annual Conf. of the Japan Society of Civil Engineers, 53(I-A13), 26-27 |
5 | Sakai, F., Yabe, J., Ohgaki, K. and Hashimoto, Y (1997), 'A study on positioning of cross beam in composite two-plate-girder bridges', Bridge and Foundation Engineering, 97(3), 31-38 |
6 | Takahashi, S., Shimura, T, Tachibana, Y. and Konishi, T. (1996), 'Design and study of structural performance for the two-girder bridge Horonai River Bridge', Bridge and Foundation Engineering, 96(2), 23-30 |