1 |
Jones, H.L. (1984), "Minimum cost prestressed concrete beam design", J. Struct. Eng., ASCE, 111(11), 2464-2478.
DOI
ScienceOn
|
2 |
Magnel, G. (1948), Prestressed Concrete, Concrete Publications, London, U.K.
|
3 |
Walsh, G.R. (1975), Methods of Optimization, John Wiley and Sons, London, U.K.
|
4 |
Kirsh, U. (1972), "Optimum design of prestressed beams", Comput. Struct., 2, 573-583.
DOI
ScienceOn
|
5 |
Morris, D. (1978), "Prestressed concrete design by linear programming", J. Struct. Div., ASCE, 104(ST3), 439-452.
|
6 |
Fereig, S.M. (1994), "An application of linear programming to bridge design with standard prestressed girders",Comput. Struct., 50(4), 455-469.
DOI
ScienceOn
|
7 |
Taylor, M.A. (1987), "Direct design of nonprismatic prestressed beams: I", J. Struct. Eng., ASCE, 113(6), 1154-1166.
DOI
ScienceOn
|
8 |
Wang, C.H. (1970), "Optimum design of prestressed concrete members", J. Struct. Div., ASCE, 96(ST7), 1525-1534.
|
9 |
Taylor, M.A. and Amirebrahimi, A. (1987), "Direct design of nonprismatic prestressed beams: II", J. StructEng., ASCE, 113(6), 1167-1184.
DOI
ScienceOn
|
10 |
ACI 318-95. (1995), Building Code of Requirements for Reinforced and Prestressed Concrete, Portland Cement
Association.
|
11 |
Cohn, M.Z. and MacRae, J. (1983), "Optimization of structural concrete beams", J. Struct. Eng., ASCE, 110(13),1573-1588.
|
12 |
Khachaturian, N. and Gurfinkel, G. (1969), Prestressed Concrete, McGraw-Hill, New York, N.Y.
|
13 |
Cagatay, I.H. (1996), "Optimum design of prestressed concrete beams", thesis submitted to the University ofCukurova, PhD, Adana, Turkey.
|
14 |
Saouma, V.E. and Murad, R.S. (1984), "Partially prestressed concrete beam optimization", J. Struct. Eng.,ASCE, 110(3), 589-604.
DOI
ScienceOn
|
15 |
Birkeland, H.W. (1974), "How to design prestressed concrete beams of minimum cross section", ACI J., 634-641.
|