Reliability Design Analysis for Underwater Buriend PBA Based on PoF |
Kim, Ji-Young
(LIGNEX1)
Lee, Ki-Won (LIGNEX1) Yoon, Hong-Woo (LIGNEX1) Lee, Seung-Jin (LIGNEX1) Heo, Jun-Ki (LIGNEX1) Kwon, Hyeong-Ahn (ExleetEdge) |
1 | Chang, D. G. (2012). "PCB main process and technology". |
2 | Lee, S. I., Shin, S. W., and Ko, D. S. (2013). "A Study on Failure pattern in PCB Manufacturing Process". Journal of The Society of Convergence Knowledge Transactions, Vol. 2, No. 1. |
3 | Choi, I. K., Masato Npakajima, Choun, Y. U., Yasuki Ohtori (2009). "Development of the site-specific uniform hazard spectra for Korean nuclear power plant sites". |
4 | Telcordia GR-63-Core Issue 3 (2006). section 4.4 & 5.4. |
5 | IPC-2221A(2003). "Generic Standard on Printed Board Design". |
6 | Harry, M. and Schroeder, R. (1999). Six Sigma, Doubleday. |
7 | http://www.dfrsolutions.com. |
8 | Cranwell, R. M. and Hunter, R. L. (1997). Architectural Design for Reliability. |