1 |
Lee, M. C. (2012). A study on reliability & availability of train detection using virtual track circuit. Department of Railroad Electrical & Signalling Engineering Graduate School of Railroad, Seoul National University of Science and Technology.
|
2 |
Ko, C. S. (2014). An analysis on the life cycle of man electronic components for high speed train(KTX), The Graduate School of Engineering Hanyang University.
|
3 |
Kim, J. W. Park, J. S., Lee, H. Y. and Kim, J. H. (2008). "A conceptual procedure of RAMS centered maintenance for railway systems". Journal of the Korean Society for Railway, Vol. 11, No.1, pp. 19-25.
|
4 |
Chung, I. S., Kim, J. W. and Lee, K. W. (2008). "The study on the demonstration test of quantitative reliability requirements for rolling stocks". Journal of the Korean Society for Railway, Vol. 11, No. 3 pp. 233-239.
|
5 |
Kim, J. K. (2003). "RAMS of railway control system, the korean institute of electrical engineers". Electrical Machinery and Energy Conversion Systems, Autumn Conference Papers, pp. 391-394.
|
6 |
Kim, C. S. and Park, M. H. (2012). "Durability evaluation on doorstep equipments used for low and high level platforms at railway vehicle". Journal of the Korea Academia-Industrial cooperation Society, Vol. 13, No. 9, pp. 3889-3894.
DOI
|
7 |
Jeong, Y., Kim, J. W. and Kim, J. B. (2008). "A case study on evaluating RAM performance of the door systems through field data". Journal of the Korean Society for Railway, Conference Papers, pp. 1473-1480.
|
8 |
MIL-HDBK-472 (1966). Maintainability prediction.
|
9 |
Kim, K. S., Choi, J. M. and Lee, J. S. (2007). Interlocked control and interface safety between train door and PSD, The Korea Society for Railway, Spring Conference Papers, pp. 249-254.
|
10 |
Lee, H. D. (2016). RAMS Estimation and Demonstration of Elevating Equipment & Platform Screen Door for Urban Railway Systems, Daegu University Doctoral thesis.
|