Patrol Monitoring Plan for Transmission Towers with a Commercial Drone and its Field Tests
![]() |
Kim, Seok-Tae
(KEPCO Research Institute, Korea Electric Power Corporation)
Park, Joon-Young (KEPCO Research Institute, Korea Electric Power Corporation) Lee, Jae-Kyung (KEPCO Research Institute, Korea Electric Power Corporation) Ham, Ji-Wan (KEPCO Research Institute, Korea Electric Power Corporation) Choi, Min-Hee (KEPCO Research Institute, Korea Electric Power Corporation) |
1 | N. Pouliot and S. Montambault, "LineScout Technology: From Inspection to Robotic Maintenance on Live Transmission Power Lines," IEEE International Conference on Robotics and Automation, pp. 1034-1040, 2009. |
2 | P. Debenest, M. Guarnieri, K. Takita, E. F. Fukushima, S. Hirose, K. Tamura, A. Kimura, H. Kubokawa, N. Iwama and F. Shiga, "Expliner‐Robot for Inspection of Transmission Lines," IEEE International Conference on Robotics and Automation, pp. 3978-3984, 2008. |
3 | P. Debenest and M. Guarnieri, "Expliner‐From Prototype Towards a Practical Robot for Inspection of High‐Voltage Lines," International Conference on Applied Robotics for the Power Industry, 2010. |
4 | H. Wang, F. Zhang, Y. Jiang, G. Liu and X. Peng, "Development of an Inspection Robot for 500kV EHV Power Transmission Lines," IEEE/RSJ International Conference on Intelligent Robots and Systems, pp. 5107-5112, 2010. |
5 | B. Wang, L. Han, H. Zhang, Q. Wang and B. Li, "A Flying Robotic System for Power Line Corridor Inspection," IEEE International Conference on Robotics and Biomimetics, pp. 2468-2473, 2009. |
6 | B. Wang, X. Chen, Q. Wang, L. Liu, H. Zhang and B. Li, "Power Line Inspection with A Flying Robot," International Conference on Applied Robotics for the Power Industry, 2010. |
7 | J. I. Larrauri, G. Sorrosal and M. Gonzalez, "Automatic System for Overhead Power Line Inspection using an Unmanned Aerial Vehicle -RELIFO Project‐", International Conference on Unmanned Aircraft Systems, pp. 244-252, 2013. |
8 | L. F. Luque‐Vega, B. Castillo‐Toledo and A. Loukianov, "Power Line Inspection Via an Unmanned Aerial System Based on the Quadrotor Helicopter," IEEE Mediterranean Electrotechnical Conference, pp. 393-397, 2014. |
9 | 한국전력공사 송변전운영처, 가공송전운영업무기준, H0‐송변‐기준‐0002, 2017.01.31.(개정) |
10 | Fabio Bologna, "UAS Research - Results of Electrical Effects Testing," EPRI, February 2017. |
11 | J. M. Bakhashwain, M. H. Shwehdi, U. M. Johar and A. A. AL‐Naim, "Magnetic Fields Measurement and Evaluation of EHV Transmission Lines in Saudi Arabia," International Conference on Non‐Ionizing Radiation at UNITEN(ICNIR 2003), October 2003. |
12 | Seok‐tae Kim, Joon‐young Park, Jae‐kyung Lee, In‐hyuk Choi, Ji-wan Ham, "Development of GPS Coordinates Measuring Algorithm for Transmission Tower" KEPCO Journal on Electric Power and Energy, Vol. 3, No. 2, December 2017. |
13 | 한국전력공사 전력연구원, "송전선로 감시진단용 생체모방 드론 시스템 개발(세부과제)(1단계 중간보고서)", pp.19-20, 2017. |
14 | N. Pouliot and S. Montambault, "Geometric Design of the LineScout, a Teleoperated Robot for Power Line Inspection and Maintenance," IEEE International Conference on Robotics and Automation, pp. 3970-3977, 2008. |
![]() |