A Feasibility Study on Adopting Sliding Pressure Operation for Drum Type Boiler |
Baek, SeHyun
(KEPCO Research Insitute, Korea Electric Power Corporation)
Kim, HyunHee (KEPCO Research Insitute, Korea Electric Power Corporation) Park, SangBin (KEPCO Research Insitute, Korea Electric Power Corporation) Kim, YoungJoo (KEPCO Research Insitute, Korea Electric Power Corporation) Park, Hoyoung (KEPCO Research Insitute, Korea Electric Power Corporation) |
1 | Sehyun Baek, "Variable pressure operation of drum boiler", KCA News Vol 77, 2010. |
2 | K.C. Cotton, "Improving and evaluating steam turbine performance," 2nd Edition, 1998. |
3 | Joongho Lee, "Thermo dynamical design theory and application for variable pressure operation", International power technology, TM-8. |
4 | KOSPO, "Technical data steam generator and auxiliaries for Namjeju # 3,4", 2007. |
5 | T. H. Kim, Y. S. kyun, B. C. Park, " Performance Change Characteristics of Turbine Cycle by Decreasing Main Steam Pressure of Fossil Power Plant", Kosee symposium, pp140, 2015. |
6 | KEPCO, " Annual power plant O&M report of Yeusu", 1980. 2009. |