Browse > Article
http://dx.doi.org/10.6113/TKPE.2014.19.4.303

The Application and Verification of the 2MVA Battery Energy Storage System(BESS) with Wind-turbine in Micro-grid of Gapado, Jeju  

Kim, Seung-Mo (POSCO ICT R&D Center Electric & Electron Technology Team)
Oh, Seung-Jin (POSCO ICT R&D Center Electric & Electron Technology Team)
Lee, Jong-Hak (POSCO ICT R&D Center Electric & Electron Technology Team)
Kim, Tae-Hyeong (POSCO ICT R&D Center Electric & Electron Technology Team)
Kwon, Byung-Ki (POSCO ICT R&D Center Electric & Electron Technology Team)
Ahn, Jae-Min (POSCO ICT R&D Center)
Jin, Kyung-Min (POSCO ICT R&D Center)
Choi, Chang-Ho (POSCO ICT R&D Center)
Publication Information
The Transactions of the Korean Institute of Power Electronics / v.19, no.4, 2014 , pp. 303-311 More about this Journal
Abstract
This paper shows the test result of 2MVA BESS(Battery Energy Storage System) with wind-turbine in micro-grid of the Gapado. To implement of micro-grid with BESS, characteristics of generator and customer load in grid are considered. Also, to operate of 2-parallel PCU(Power Conversion Unit) in BESS, the droop control is adopted with operating mode of grid independent. Performances of BESS with wind-turbine were verified by analysis of power quality such as voltage harmonics, ratio of voltage and frequency regulation, and by measurement of waveform such as output voltage and current.
Keywords
BESS(Battery Energy Storage System); micro grid; droop control; wind turbine;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Young-hun Jung,, "Korea's Smart Grid policy and deployment," Ministry of Knowledge Economy(MKE) Counselor to the Minister, pp. 15-17, Nov. 2013.
2 Anca D. Hansen, Florin lov, Frede Blaabjerg and Lars H. Hansen, "Review of Comtemporary Wind Turbine Concepts and their Market Penetration," Wind Engineering Vol 28, No. 3, pp. 247-263, 2004.   DOI
3 Smart Renewable Project Business Plan(POSCO ICT), 2009.
4 Soo-Hong Kim, Tae-Hyeong Kim, Yun-Hyun Kim, Dong-Seok In, Byung-Ki Kwon, Chang-Ho Choi, "A Development of 2MVA Battery Energy Storage System," The Transactions of Korean Institute of Power Electronics, Vol. 17, No. 2, pp. 174-181, Apr. 2012.   과학기술학회마을   DOI   ScienceOn
5 Seung-Jin Oh, Tae-Hyeong Kim, Byung-Ki Kwon, "A Parallel Control Algorithm using Droop Control for Battery Energy Storage System(BESS)," The Korean Institute of Power Electronics, pp. 131-132, Nov. 2013.
6 Seung-Jin Oh, Tae-Hyeong Kim, Byung-Ki Kwon, "A Parallel Control Algorithm using Droop Control for Battery Energy Storage System(BESS)," The Korean Institute of Power Electronics, pp. 131-132, Nov. 2013.
7 IEEE Application Guide for IEEE Std $1547.2^{TM}$ 2008.
8 Sergio Vazquez, Srdjan M. Lukic, Eduardo Galvan, Leopoldo G. Franquelo, Juan M. Carrasco, "energy storage systems for transport and grid applications," IEEE Trans. Industrial Electronics, Vol. 57, No. 12, pp. 3881-3895, 2010.   DOI   ScienceOn
9 K.C.Divya, Jacob Ostergaard, "Battery energy storage technology for power system - An overview," Electric Power Systems Research, pp. 511-520, 2009.
10 Seung-Jin Oh, Tae-Hyeong Kim, Byung-Ki Kwon, "A Parallel Control Algorithm using Droop Control for Battery Energy Storage System(BESS)," The Korean Institute of Power Electronics, pp. 131-132, Nov. 2013.