1 |
Yang, Y.B., Liao, S.S., Lin, B.H. (1995). "Impact formulas for vehicle moving over simple and continuous beams." Jouural of Stmctural Engineering, ASCE, Vol. 121, No.11, pp.1644-1650.
DOI
ScienceOn
|
2 |
김규춘 (1994). 차량통행 및 제동으로 인한 도로교의 동적거동 해석. 박사학위논문, 고려대학교.
|
3 |
김종헌, 성익현, 김상철, 김승억 (2007). "윤하중 실험기를 이용한 이동질량 실험." 대한토목학회 논문집, Vol.27 No.6A, pp.789-795.
|
4 |
대우건설, 세종대학교, 한국도로공사 (2005). 승용차 전용 조립식 고가도로 건설기술 개발. 건설교통부 건설기술 연구개발보고서.
|
5 |
Fatmir, M. (2002). Horizontal Shear Connectors for Precast Prestressed Bridge Deck Panels. Thesis, Virginia Polytechnic Institute and State University, USA.
|
6 |
Fryba, L. (1972). Vibration of Solids and Structures under Moving Loads. Noordhoff Intemational Publishing.
|
7 |
Issa, M.A., Yousif, A.A., Kaspar, I.I., Khayyat, S.Y. (1998). "Analysis of full depth precast concrete bridge deck panels." PCI Journal, Vol.43 , No.1, pp.74-85.
DOI
|
8 |
Matsui, S. (1997). " Technology development of bridge deck - Innovation, durabiliy and construction." Joumal of Bridge and Foundation Engineering, Vol.31, No.8, pp.84-94.
|