1 |
T. Skeie, S. Johanessen, and C. Brunner, "Ethernet in Substation Automation," IEEE Control System Magazine vol. 22 no. 3, 2002.
DOI
|
2 |
Alex Apostolov, "We can not test 21st century IED with 20st century testing technology", Pac world winter, 2008.
|
3 |
G.Booch, J.Rumbaugh and I.Jacobson, "The United modelling language user guide", Addison-Wesley, 1999.
|
4 |
J.Arlow and I.Neustadt, "UML 2 and the Unified Process, 2d", Addison-Wesley Professional, 2005.
|
5 |
이희만, "UML을 이용한 객체지향 분석/설계", 삼성SDS멀티캠퍼스, 2004.
|
6 |
"디지털 기술기반의 차세대 변전시스템 개발 1단계 보고서", 한국전력공사, 2008.
|
7 |
이남호, 장병태, "UML을 이용한 모선보호 IED의 IEC 61850 성능시험 절차서 개발", 한국조명전기설비학회 2008년 1월호, 2008.
과학기술학회마을
|
8 |
Juergen Holbach, Julio Rodriquez, Craig Wster,Drew Baigent, Lars Frisk, Steven kinsman and Luc Hossenlopp "Status on the First IEC 61850 based Protection and Con Multi-Vendor Project in the United State", TVA 500[kV] project Report, 2007.
|
9 |
J. AMANTEGUI, A.CREZO, J.TORRES, A.RIVAS and F.COBELO, "The University City SAS Firt Project within IBERDROLA Group using IEC 61850 for Complete Substation Final Experience and Future Expectations", CIGRE B5-108, 2006.
|