1 |
K. Schwarz, "IEC 61850, IEC 61400-25 and IEC 61970: Information models and information exchange for electric power systems", DistribuTech, 10/2004.
|
2 |
X. Qiu, W. Wimmer, "Applying object-orientation and component technology to architecture design of power system monitoring" International Symposium on Component-Based Software Engineering, 2000.
|
3 |
http://en.wikipedia.org/wiki/IEC_61850.
|
4 |
SMA Solar Technology AG: Sunny Island 5048 - Installation & Instruction Manual.
|
5 |
David Nestle: Concept of the Open Gateway Energy Management Alliance, http://www.ogemalliance.org/files/OGEMA-Alliance.pdf, 2009.
|
6 |
Arzuaga, T., Cadenas, A., Arzuaga, A, "Fiabilidad de las redes LAN en las Subestaciones Electricas", XII ERIAC 2007.
|
7 |
IEEE 802.3ad, "Link Aggregation Control Protocol Specification", IEEE, 2000.
|
8 |
IEEE 802.1D-2004, "Spanning Tree Protocol Specification", IEEE, 2004.
|
9 |
Seifert, R. "The Switch Book", J. Wiley & Sons, 2000.
|
10 |
IEC61850-5, "Communications Networks and Systems in Substations. Part 5: Communication Requirements for Functions and Device Models", IEC, 2003.
|
11 |
"IEC 61850: Communication networks and systems in substations", IEC TC 57.
|
12 |
"IEC 61850 part 7-420: DER Logical Nodes", IEC TC 57.
|
13 |
D. Nestle, C. Bendel, J. Ringelstein, K. Schwarz, "Data models for the integration of the low voltage level into grid communication and control using decentralised decision" Oldenburg, June 2007.
|
14 |
T. Kostic, O. Preiss, C. Frei "Understanding and using the IEC 61850: a case for meta-modelling" Computer Standards & Interfaces, 2004.
|