A Study on the Testing Method of IEC 61850 based Merging Unit  

Lee, Nam-Ho (한국전력공사)
Jang, Byung-Tae (한국전력공사)
Publication Information
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers / v.23, no.8, 2009 , pp. 41-47 More about this Journal
Abstract
The power IT project "Development of Prototype for Advanced Substation Automation System based on the Digital Control Technology", is going on how to perform the verification of a IEC 61850 based Merging Unit for development of the full Substation Automation system from station bus to process bus. the testing method that this paper suggests, is including the conformance testing of IEC 61850 communication services and transmission functions of digital sampled values such as current and voltage, and referring to IEC 61850 conformance testing of IED. And finally, the paper shows a test system for the Merging Unit.
Keywords
IEC 61850; Substation Automation; IED; Testing procedure; Merging Unit; Conformance;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 한국전력공사, "디지털 기술기반의 차세대 변전시스템 개발 1단계 보고서", 지식경제부, 2008
2 이남호, 장병태, "IEC 61850 규격 기반 디지털 변전자동 화 시스템 통신성능 시험에 관한 연구", Trans. KIEE. Vol. 57 No1, 2008
3 IEC 61850-9-1, 9-2, "Specific Communication Service Mapping (SCSM)-Sampled values over ISO/IEC 8802-3", IEC, 2004
4 IEC 61850-10, "Comformance Testing", IEC, 2004
5 "Conformance Test Procedures for Server Devices with IEC 61850-8-1 interface Revision 2.0", UCA IUG
6 "FUNCTIONAL TESTING OF IEC 61850 BASED SYSTEMS", CIGRE Task Force B5.92, 2007   과학기술학회마을
7 Luc HOSSENLOPP, Damien THOLOMIER and Dac Phuoc BUI, "Proces bus: Experience and impact on future system architecture", CIGRE B5-104, 2008