Browse > Article
http://dx.doi.org/10.22156/CS4SMB.2019.9.2.172

Development of Automatic Drawing Program for Elevator Installation Drawing to Strengthen Competitiveness of The Elevator Industry  

Ko, Young-joon (Korea Lift College)
Kim, Byoung-ik (Modoo Solusion Co. Ltd.)
Han, Kwan-hee (Dept. of Industrial & Systems Engineering/Engineering Research Institute, GyeongsangNat'l Univ)
Publication Information
Journal of Convergence for Information Technology / v.9, no.2, 2019 , pp. 172-179 More about this Journal
Abstract
Recently, design automation of installation drawings and design elements has been required in the elevator industry. This is recognized as an important role in securing adaptability on site, reducing design errors, and enhancing export competitiveness. However, in case of a small company doesn't have enough resources to develop the program, and it is difficult to develop a design automation program. Therefore, it is necessary to have an automatic drawing generation program that enables small companies to easily invest and use, while allowing users to concentrate on productive tasks. In this paper, we propose an automatic drawing generation program using parametric coding technique. This program is linked with the web service and automatically creates the drawing when the user enters the site information on the web. This is useful for elevator installation and maintenance due to reduced drawing time for elevator drawings.
Keywords
Design Automation Program; Design Template; Elevator Design; Parametric Technique; Parametric Coding;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 I. H. Ki.m, M. J. Lee, J. S. Choi & G. T Kim. (2016), Development of an Application to Generate 2D Drawings in Automation using Open BIM Technologies. Korean Journal of Computational Design and Engineering, 21(4), 417-425.   DOI
2 H. S. Jung & Y. H. Cho. (2005). Lay-out Auto-Design system development for an Automated hemming die design, Korean Journal of Computational Design and Engineering, (2005.1), 715-719.
3 K. H. Han, C. W. Park., G. B. Lee. & T. I. Hwang. & K. Y. Kim. (2003), The Development of an Product Cost Estimation System at the Product Design Stage. Korean Journal of Computational Design and Engineering, 8(2), 101-108.
4 K. H. Han, C. W. Park, J. S. Oak. & K. S. Kim. (2005), The Development of a Shop Floor-Centered Information System for the Integration of Design and Manufacturing Data, Korean Journal of Computational Design and Engineering, 10(4), 237-243.
5 Y. S. Moon, H. Y. Kim. & H. W. Park. (2013). AutoCAD 2014,. Seoul : EasysPublishing Co., Ltd.
6 British Standards Institution (2015). BS EN 81-1:1998+A3:2009 Safety Rules for the Construction and Installation of Lifts: Electric. British : British Standards Institution.
7 Ministry of The Interior and Safety, (2018). Elevator Safety Inspection Standard,. Jinju Korea : Korea Elevator Safety Agency.
8 E. N. Ko, (2007). Visual Basic Programming. Seoul : Hanbit Publishing Network, Inc.
9 J. S. Choe. (2016). Excel 2016 Macro & VBA Bible. Seoul : Hanbit Publishing Network, Inc.
10 G. R. Strakosch & R. S. Caporale. (2010). The vertical transportation handbook 4th edition. Hobokon, NJ US : John Wiley & Sons, Inc.
11 Y. G. Hyun & J. Y. Lee. (2018). Trands Analysis and Future Direction of Business Process Automation, RPA(Robotic Process Automation)in the Times of Convergence. Journal of Digital Convergence, 16(11), 313-327.   DOI