Stochastic Radar Beam Scheduling Using Simulated Annealing
![]() |
Roh, Ji-Eun
(Agency for Defense Development)
Ahn, Chang-Soo (Agency for Defense Development) Kim, Seon-Joo (Agency for Defense Development) Jang, Dae-Sung (KAIST) Choi, Han-Lim (KAIST) |
1 | S. Ghosh, R. Rajkumar, J. Hansen, and J. Lehoczky, "Integrated QoS aware resource management and scheduling with multiresource constraints", Real Time System, vol. 33, pp. 7-46, 2006. DOI ScienceOn |
2 | S. Gopalakrishnan, C. S. Shih, P. Ganti, M. Caccamo, and L. Sha, "Radar dwell scheduling with temporal distance and energy constraints", International Radar Conference, 2004. |
3 | K. Harada, T. Ushio, and Y. Nakamoto, "Adaptive resource allocation control for fair QoS management", IEEE Transactions on Computers, vol. 56, no. 3, pp. 344-357, 2007. DOI |
4 | 한순미, 백승우, 조선영, 조겸래, 이대우, 김해동, "유전 알고리즘을 이용한 위성 임무 스케줄링 최적화", 한국항공우주학회지, 36(12), pp. 1130-1239, 2008. |
5 | M. L. Pinedo, Scheduling Theory, Algorithms, and Systems, Third Edition, Springer, ISBN: 978-0-387-78934-7, 2008. |
6 | Stefka Fidanova, "Simulated annealing for grid scheduling problem", IEEE John Vincent Atanasoff International Symposium on Modern Computing( JVA'06), pp. 41-45, 2006. |
7 | V. Cerny, "A thermodynamical approach to the traveling salesman problem: An efficient simulated annealing algorithm", Journal of Optimization Theory and Applications, vol. 45, no. 1, pp. 41-51, 1985. DOI ScienceOn |
8 | K. Dowsland, "Variants of simulated annealing for practical problem solving", V. Rayward-Smith editor, Applications of Modern Heuristic Methods, Henley-on-Thames: Alfred Walter Ltd., 1995. |
9 | I. H. Osman, C. N. Potts, "Simulated annealing for permutation flow-shop scheduling", Omega 17, pp. 551-557, 1989. DOI ScienceOn |
10 | 강승택, "Ka-대역 군지연-등화 여파기용 SA 기법과 CG 기법의 하이브리드 설계 기법", 한국전자파학회논문지, 15(8), pp. 775-780, 2004년. |
11 | Zhen Ding, "A survey of radar resource management algorithms", IEEE Canadian Conference on Electrical and Computer Engineering, CCECE, pp. 1559-1564, 2008. |
12 | Zhen Ding, "A survey of radar resource management algorithms", IEEE Canadian Conference on Electrical and Computer Engineering, CCECE, pp. 1559-1564, 2008. |
13 | J. M. Butler, Multi-function radar tracking and control, University College London. Ph.D. Thesis, 1998. |
14 | A. J. Orman, C. N. Potts, A. K. Shahani, and A. R. Moore, "Scheduling for a multifunction array radar system", European Journal of Oparational Research, no. 90, pp. 13-25, 1996. |
15 | S. L. C Miranda, C. J. Baker, K. Woodbridge, and H. D. Griffiths, "Phased array radar resource management: a comparison of scheduling algorithms", in Proc. IEEE Radar Conf., pp. 79-84. 2004. |
16 | W. Komorniczak, J. Pietrasinski, "Selected problems of MFR resources management", the 3rd International Conference on Information Fusion, vol. 2, pp. 3-8, Jul. 2000. |
17 | S. L. C. Miranda, K. Baker, K. Woddbridge, and H. D. Griffiths, "Fuzzy logic approach for prioritisation of radar tasks and sectors of surveillance in multifunction radar", IET Radar Sonar Navigation, vol. 1, no. 2, pp. 131-141, 2007. DOI ScienceOn |
18 | V. Krishnamurthy, R. J. Evans, "Hidden Markov model multiarm bandits: A methodology for beam scheduling in multitarget tracking", IEEE Transactions on Signal Processing, vol. 49, no. 12, pp. 2893- 2908, 2001. DOI ScienceOn |
![]() |