Case Study on Rock Slope Failures Caused by Geologic Structures
![]() |
Park, Boo Seong
(Ssangyong Engineering & Construction Co., Ltd.)
Cho, Hyun (Ssangyong Engineering & Construction Co., Ltd.) Park, Dong In (Ssangyong Engineering & Construction Co., Ltd.) Kim, Jun Ho (Ssangyong Engineering & Construction Co., Ltd.) Choi, Jae Ho (Ssangyong Engineering & Construction Co., Ltd.) |
1 | Baek, Y., Kim, G. W., and Koo, H. B., 2000, Slope stability associated with construction, The Journal of Engineering Geology, 10(2), 1-17 (in Korean with English abstract). |
2 | Chung, H. S. and You, B. O., 1996, Failure Types in Rock Slopes According to Geological Characteristics, Journal of the Korean Geotechnical Society, 12(6), 37-49 (in Korean with English abstract). |
3 | Lee, C. S. and Lee, B. W., 2007, Cases of Slope Failures and Stabilizing Measures, Proceedings of KSEG Spring Conference, 2007(1), 18-21 (in Korean). |
4 | Park, B. S., Cho, H., Cha, S. H., and Lee, K. H., 2006, Case Study on the Causes for the Failure of Large Scale Rock Mass Slope Composed of Metasedimentary Rocks, The Journal of Korean Society for Rock Mechanics, 16(6), 506-525 (in Korean with English abstract). |
5 | Park, B. S., Cho, H., Youn, S. P., and Lee, S. H., 2011, Case Study on Stability Analysis of Phyllite Rock Slopes in National Road Construction, International Journal of Geo-Engineering, 3(3), 41-52. |
6 | Park, B. S., Cho, H., and Youn, S. P., 2013, Case Study on Stability Analysis and Countermeasures of Landslide along Deep-seated Geological Boundary, In Proceedings of The 6th Japan-Korea Joint Symposium for Landslide Disaster Mitigation, Nagano, Japan, 66-77. |
7 | You, B. O., 2002, Assumption of Shear Strength on Failed Discontinuities Due to Back Analysis, Proceedings of KGS Fall National Conference, Seoul, Korea, 213-227 (in Korean). |
![]() |