1 |
ASCE/EWRI Task Committee on Dam/Levee Breaching, 2011, Earthen embankment breaching, Journal of Hydraulic Engineering, 137(12), 1549-1564.
DOI
|
2 |
Costa, J. E., 1988, Floods from dam failures, In: Flood geomorphology, edited by Baker, V. R., Kochel, R. C., and Patton, P. C., John Wiley, NY, 439-463.
|
3 |
Costa, J. E. and Schuster, R. L., 1988, The formation and failure of natural dams, Geological Society of American Bulletin, 100(7), 1054-1068.
DOI
|
4 |
Fread, D. L., 1989, National weather service models to forecast dam-breach floods, in Hydrology of disasters, edited by Starosolszky, O. and Melder., O. M., James and James, London, 192-211.
|
5 |
French, R. H., 1986, Open channel hydraulics, McGraw-Hill Book Company, 339-343.
|
6 |
Lee, K. H., Son, M. H., Kim, S. W., Yu, S., Cho, J., Kim, J. M., and Jung, K. J., 2014, Sensitivity Analysis of Model Parameters of Dam-Break/FLO-2D coupled Model to Flood Inundation, The Journal of Engineering Geology, 24(1), 53-67 (in Korean with English abstract).
DOI
|
7 |
Lee, G. H., Lee, S. S., and Jung, K. S., 2010 Development of a Raster-based two-dimensional flood inundation model, Korean Society of Hazard Mitigation, 10(6), 155-163 (in Korean with English abstract).
|
8 |
Peng, M. and Zhang, L. M., 2012, Breaching parameters of landslide dams, Lndslides, 9(1), 13-31.
DOI
|
9 |
Singh, V., 1996, Dam breach modeling technology, Series: Water Science and Technology Library, Springer, 17, 27-40.
|
10 |
Walder, J. and O’connor, J. E., 1997, Methods for predicting peak discharge of floods caused by failure of natural and constructed earthen dams, Water Resources Research, 33(10), 2337-2348.
DOI
|
11 |
Yu, S., Lee, S., Kim, S. W., Choi, E. K., Lee, K. H., and Choi, B. H., 2015, Development of a flood loss estimation tool within GIS software, Journal of the Korea Society of Disaster Information, 11(3), 436-445 (in Korean with English abstract).
DOI
|