1 |
Song, C. H., Kwon, K. B., Park, J. Y., Shin, D. Y., and Cho, J. W., 2012, Optimization of flow path of drill bit using CFD simulation, Tunnel and Underground Space, 22(4), 257-265.
과학기술학회마을
DOI
ScienceOn
|
2 |
The Freedonia Group Inc., 2009, World mining equipment, pp. 32-54.
|
3 |
Tone Corporation, 1997, Extendable bit, KR0461525.
|
4 |
Top Drill International Co., Ltd., 2002a, Multi-using structure of bits for air hammers, KR0273989.
|
5 |
Top Drill International Co., Ltd., 2002b, Separation structure of bits for Air-Hammers, KR0273993.
|
6 |
Ahn, J. S. and Choi, J. K., 2011, Patent analysis on the treatment technology for acid doil and scid drainage, Journal of The Korean Society for Geosystem Engineering, 48(3), pp. 359-370.
|
7 |
Chungnam intellectual property center, 2011, Draw the patent map customized company, support project for small and medium business industry, pp. 33-62.
|
8 |
Kwon, K. B., Song, C. H., Park, J. Y., Shin, D. Y., Cho, J. W., and Cho, S. H., 2013, Rock fragmentation assessment of a drill bit by hopkinson bar percussion test, Tunnel and Underground Space, 23(1), 42-53.
과학기술학회마을
DOI
ScienceOn
|
9 |
Lee, B. K., 1998, Principle of excavation engineering, Daeyun, pp. 8-9.
|
10 |
Lee, K. I., 2007a, Hammer bit, KR0871127.
|
11 |
Lee, K. I., 2007b, Hammer bit having easiness of parts exchange, KR0898828.
|
12 |
Min, K. N., Ahn, K. K., Lee, J. B., Park, H. J., Lee, J. W., and Lee, J. K., 2010, The applicability evaluation on the ground type anchor with field test, The Journal of Engineering Geology, Autumn Conference, pp. 59-63.
|
13 |
Shin, D. Y. and Song, C. H, 2012, Performance optimization of down-the-hole hammer using taguchi method, Transactions of the Korean Society of Mechanical Engineers, A, 36(1), 109-116.
과학기술학회마을
DOI
ScienceOn
|