A Study on the Improvement of Optimal Load Range for Sliding Pressure Operation of coal-fired Power Plant  

Lee, Sang-Hun (Dept. of Mechanical Facility Control Engineering, Korea University of Technology and Educatio)
Wang, Min-Seok (Dept. of Mechanical Facility Control Engineering, Korea University of Technology and Educatio)
Wee, Sang-Bong (Dept. of Mechanical Facility Control Engineering, Korea University of Technology and Educatio)
Son, Yung-Deug (Dept. of Mechanical Facility Control Engineering, Korea University of Technology and Educatio)
Publication Information
Journal of IKEEE / v.23, no.2, 2019 , pp. 675-680 More about this Journal
Abstract
The coal-fired power plant is operated by a combined operation method, which is operated by sliding pressure operation under low load and by fixed pressure operation under high load for improved efficiency. The combined operation is divided into two and three valve open modes. Each plant is operated by selecting the turbine control valve mode in accordance with the manufacturer's recommendation, but is not really operating at the optimal sliding pressure operation according to load range, also Load range of each plant is configured differently. The internal efficiency of the high-pressure turbines is reduced due to loss of the turbine valves and the plant efficiency is reduced. To solve these problems, In this paper, the optimum load range is selected through the analysis method of thermal performance by each load in order to improve the optimum variable pressure operation load range by turbine control valve mode.
Keywords
Power Plant; Turbine; Sliding Pressure; Constant Pressure; Control Valve; 3 Valve; 2 Valve;
Citations & Related Records
연도 인용수 순위
  • Reference
1 S. H. Park, D. R. Rhim, C. S. Yeom, J. M. Cha, J. U. Shin, C. S. Lee, "Thermo-Economic Evaluation of 500 MW Class Coal Fired Power Plant Combined with Supercritical Carbon Dioxide Brayton Cycle," Journal of Energy & Climate Change, vol.11, no.1, pp.1-12, 2016.
2 G. P. Lim, M. S. Kim, I. K. Choi, D. Y. Park, H. Y Kim, "The Development Of Program Based On Model to Control Generator Output in Power Plant," The transactions of The Korean Institute of Electrical Engineers, vol.59, no.3, pp.614-622, 2010.   DOI
3 J. K. Lee, Y. S. Ahn, H. Jung, Y. K. Lee, B. S Han, "The Development of Full-Scope Replica Simulator for Variable Supercritical Pressure Once-through Fossil Power Plants," Journal of Institute of Control, Robotics and Systems, vol.4, no.3, pp.392-398, 1998.
4 J. H. Woo, I. K. Choi, D. Y. Park, J. A. Kim, "Procedure to Verify the Turbine Control Function of a Steam Turbine Power Plant," in Proc. of the 2010 KIEE Conference, pp.1693-1694, 2010.
5 Goutam Khankari, Sujit Karmakar, "Operational optimization of turbo-generator (TG) cycle of a 500MW coal-fired thermal power plant," 2014 6th IEEE Power India International Conference (PIICON), pp.1-6, 2014. DOI: 10.1109/34084POWERI.2014.7117650
6 I. Y. Choi, J. A. Kim, "A Study on Turbine Bypass System in a 500MW Rated Coal Fired Supercritical Thermal Power Plant with Sliding Pressure Operation," in Proc. of the 2008 KIEE Conference, pp.1663-1664, 2008.
7 S. I. Seo, H. Y. Park, S. N. Lee, "Computational Studies on the Combustion and Thermal Performance of the Coal Fired Utility Boiler," Korean Journal of Air-Conditioning and Refrigeration Engineering, vol.21, no.3, pp.157-166, 2009.
8 Y. D. Son, J. J. Jin, "A Nonlinear PD Controller Design and Its Application to MOV Actuators," Studies in Informatics and Control, vol.28, no.1, pp.5-12, 2019.   DOI