Browse > Article
http://dx.doi.org/10.3745/KTSDE.2019.8.1.1

Project Management for the Productivity Improvement of Small and Medium-sized Enterprises (SMEs): Industrial Machinery and Equipment Manufacturing Enterprises  

Song, Youngmin (성균관대학교 글로벌창업대학원 창업학과)
Jeong, Jongpil (성균관대학교 스마트팩토리융합학과)
Park, Byungjun (성균관대학교 체력과학연구소)
Publication Information
KIPS Transactions on Software and Data Engineering / v.8, no.1, 2019 , pp. 1-12 More about this Journal
Abstract
In this paper, it was found that most of the machinery facilities problems generated by clients could be prevented in advance by systematically managing the mechanical equipment production process of small and medium enterprises (SMEs) that produce machinery facilities. Major point of this process is to establish an operating system that corresponds to reality of facility manufacturers as it represents 63% of machinery facilities problems that occur in customers and is a task that needs to be solved most intensively. Technical issues account for 23% of machinery facilities problems occurring at the client's companies and should be approached from a long-term perspective as they are directly related to the technical capabilities of the manufacturers. Organizational problems account for 14% of machinery facilities problems occurring in customer companies, and can change depending on the relationship of members and the nature of the human being, such as morality and motivation. In addition, we propose the establishment of an Internet-based production process management platform for smooth and efficient transfer of information between customers and machinery facilities manufacturers.
Keywords
SMEs; Production Improvement; Process Problem; Technical Problem; Organizational Problem; Manufacturing Process Management; Machinery Facility;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Alok Mathur, M. L. Mittal, and Govind Sharan Dangayach, "Improving productivity in Indian SMEs," Production Planning & Control, Vol. 23, Nos.10-11, pp. 754-764, Oct.-Nov. 2012.   DOI
2 Seung Chul Kim, “Adopting Systematic Project Management Methods for Productivity Improvement: Comparison of the Project Management Maturity Levels Between SMEs and Large Firms,” Asia Pacific Journal of Small Business, Vol. 33, No. 2, pp. 5-21, Jun. 2011.
3 Project Management Institute, Inc., "A guide to the project Management Body Of Knowledge (PMBOK Guide) Fourth Edition," Newtown Square, Pennsylvania, USA, 2008.
4 Woo Jong Park and Kwang Ho Park, “An Empirical Study on the Influence of SMEs Productivity Management System on Productivity Performance: Focusing on Auto Part Suppliers,” Asia Pacific Journal of Small Business, Vol. 33, No. 2, pp. 23-41, Jun. 2011.
5 EFQM(2010), EFQM ExcellenceModel, European Foundation for Quality Management [Internet], http://www.efqm.org.
6 Besterfield, D. H., C. Besterfield-Michna, G. H. Bester-field, and M. Besterfield-Sacre(1995), "Total Quality Management," Prentice Hall, Upper SaddleRiver, NJ.
7 PRINCE2(2009), "Managing Successful Projects with PRINCE2," Office of Government Commerce, London, UK.
8 Kyu Seon Hwang and Woo Jin Park, "Developing performance measurement framework for Manufacturing Execution System," Korean Operations Research And Management Society, pp. 2205-2213, May 2012.
9 Chang-Gap Seo and Young-Jae Park, “Development of Web Based Business Process Management System for Small and Medium Sized Enterprise,” Journal of the Korea Industrial Information Systems Research, Vol. 14, No. 4, pp. 153-162, Dec. 2009.
10 Korea Productivity Center(2005), "A Study on the Improvement of Management System through Certification System of Productivity Management System," 2005.
11 Hak Su Shin, Hyun Gyu Kim, and Lak Chae Chung, "A Study on the Development of the CPM3(Construction Project Management Maturity Model) for the Enterprise Project Management," Journal of the Korean Institute of Plant Engineering, Vol. 15 No. 4, pp. 11-15, 2010.
12 Sok Eun Kim and Seon Il Oh, "A study on the Productivity Management System of small and medium sized companies," Korea Safety Management and Science, pp. 395-404, Nov. 2008.
13 Jong Hwan Lee and Yong Ji Jung, "Consulting for efficient technical management," The Society of Korea Industrial and Systems Engineering, 2012 Spring Conference Papers, pp. 230-237, 2012.
14 Ju-Yong Park, Hyoung-Seok Oh, and Dong-Kun Lee, "A Study on the Production Process Management Support System for Smart Shipyard Based on Mobile," Journal of Welding and Joining, Vol. 32, No. 5 pp. 58-64, 2014.   DOI
15 Lee, In Tae, Choi, and Jin Young, "Service Process Innovation in the Perspective of PDCA Cycle : Focused on the Case Study of IBM Technical Service Support," The Korea Service Management Society, pp. 143-160, Nov.2016.
16 Paul Chang and Yi-Lin He, "Study of Failure Mode, Effect and Criticality Analysis," 2016 International Conference on Applied Electronics (AE), Sept. 2016.
17 Jang-Jin Choi and Ik-Sung Lim, “Application of the Combined Techniques for Reliability Improvement on Machine Design Process: Case Study,” Journal of Applied Reliability, Vol. 4, No. 1, pp. 71-80, 2014.
18 Park Byoung-Noh and Joo Hae-Jin, "A Study on FMEA for Railway Vehicle," Korean Society for Railway, pp. 162-168, May 2009.
19 J. S. Lee and H. S. Kim, "A Study on the Current Status and Activation Plan of the Smart Work," Journal of Korea Association for Regional Information Society, pp. 75-96, 2010.
20 Kiyeol Jang, Jihwan Kim, and Namju Jeon, "Study on FMEA for In-wheel system," The Korean Society of Automotive Engineers, pp. 2545-2552, Nov. 2009.
21 B. Bertsche, "Reliability in Automotive and Mechanical Engineering," Springer Science & Business Media, 2008.