Browse > Article

Analysis of Consciousness and Model on Land for the Another use After Quarrying  

Park, Jae Hyeon (Department of Forest Resources, College of Life Science & Natural Resources, Gyeongnam National University of Science and Technology)
Publication Information
Journal of Korean Society of Forest Science / v.101, no.3, 2012 , pp. 387-394 More about this Journal
Abstract
The study was conducted to develop an effective forest resources use models for an alternate use of abandoned quarry by an attitude survey. According to the result of survey, a pessimistic view due to dust, noise pollution, and forest damage was 5% higher than an affirmative view by economic benefits from the development of quarry. The 42% of the respondents preferred the alternate use of abandoned quarry and the 25% of the respondents wanted an art and cultural space. The optimum size of alternate use was 5-10 ha (43%) with the requirement of nearby residents (32%). According to the SWOT analysis for abandoned quarry, the strength factors were an effective use of land, the content development of modern industrial inheritance + cultural and art fusion, attraction for nearby city and visitors, a harmony of beauty landscape and clean environment, and a sustainable increase of domestic and foreign visitors with the 5-day-work week. The opportunity factors were the improvement of traffic networks through KTX and local highway, the creation of the new growth engines with the establishment of artistic creation belts, the providing of unique cultural and art space through grafting of tour and education, the creation of local income through stone processed goods, and the vitalization of local development through eco-city. The weakness factors were a psychological remoteness and backwardness, and the weakness of staying tour infra. The threat factors were a poor financial support for sustainable development in nearby quarry and a modify of legal and institutional system for the alternated use of abandoned quarry. The developed restoration models for the alternate use in abandoned quarry are classified to a sculpture park, a waterfall and lake park, a rock-climbing, a sports park + forest park, a native botanical garden, a culture and art park, a complex park, a water storage site, a water storage site to extinguish forest fire, a geriatric hospital, an agricultural facility, and a school site types etc. The results suggest that the alternate use in the abandoned soil and stone quarry is needed to establish facility use models with consideration of user's preference.
Keywords
quarry; a harmony of beauty landscape; SWOT analysis; the strength factors; the opportunity factors;
Citations & Related Records
연도 인용수 순위
  • Reference
1 서재철. 2009. 광주 동림동 석산 복원의 교훈. 산사랑 23: 36-39.
2 유기준, 김용근. 2000. 지리산국립공원 이용객 행태 및 이용관리에 대한 중요도 - 성취도 분석. 한국환경생태학회지 13(4): 367-374.
3 이준우, 신경희, 이창석. 2007. 현행 광산복구방법의 문제점과 그 개선방안. 자연환경복원포럼 자료집. pp. 309-334.
4 이준우, 차두송. 2008. 산림토목사업 감리제도의 효율화 방안에 관한 연구. 산림공학기술 6(3): 211-220.
5 조선일보. 2009. 돌 캐낸 상처 절경으로 아물다. 조선일보 5월 14일자 120판 D1.
6 한국건설산업연구원. 2007. 골재산업의 중장기육성방안.
7 한국산지보전협회. 2005. 대규모 산지훼손지 실태조사, 원인분석 및 지속가능한 산지보전을 위한 모니터링 방안. 한국산지보전협회. pp. 286.
8 한국산지보전협회. 2007. 산림훼손 복구지 사후관리 모니터링에 관한 연구. pp. 183.
9 국토해양부. 2008a. 2009년도 골재수급계획. pp. 23.
10 국토해양부. 2008b. 제4차(2009-2013) 골재수급기본계획. pp. 20.
11 김성진. 1992. 지역주민참여에 의한 도시공원 관리방안에 관한 연구. 서울대학교 석사학위논문. pp. 5-22.
12 김용근, 조중희, 박태희. 2002. 도시공원 관리에 있어서 주민의 참여의식에 관한 연구 -초안산근린공원의 이용객을 대상으로 -. 한국환경생태학회지 16(3): 287-295.
13 박영규. 2009. 산지전용허가기준의 개선방안. 월간 산림과학정보 213: 8-9.
14 산림청. 2000. 채광.채석지의 적정복구비용 산정 등에 관한 연구. 산림청. pp. 315.
15 산림청. 2006. 채석허가 및 복구제도 개선방안. pp. 185.
16 산림청. 2008. 토석채취 허가.복구지 Monitoring 체계 마련 및 활성화 방안. pp. 238.
17 산림청. 2009. 토석채취.복구지 모니터링 및 토석채취허가.채석단지 지정 활성화 방안 연구. 산림청. pp. 280.
18 삼성에버랜드. 2002. 채광완료부지 복구설계 -라파즈한라시멘트 석회석광산 -. pp. 111.