1 |
Ministry of Employment and Labor, Current Status of the Industrial Accident, 2014.
|
2 |
H.S. Kim and Y. K. Yeo, "The Evaluation of the Safety of Formwork System Considering the Continuous Collapse", Industrial Scientific Research, Vol. 18, No. 1, pp. 197-204, 2000.
|
3 |
F. C. Hadripriono and H. K. Wang, "Analysis of Cause of Falsework Failures in Concrete Structures", Journal of Construction Engineering and Management, Vol. 112, No. 1, pp.112-121, 1986.
DOI
|
4 |
Y. O. Lee and S. J. Choi, "A Proposed method of the Strength Calculation of Pipe Support", Journal of the Korean Society of Safety, Vol. 16, No. 1, pp. 59-64, 2001.
|
5 |
H. S. Kim, "The Study on the Collapse Cause Analysis of the Shore System because of the Design and Construction Deficiencies", Industrial Scientific Research, Vol. 21, No. 2, pp. 213-220, 2004.
|
6 |
KOSHA, "The Structural Stability of the Shore", Regulation Guideline, 2003.
|
7 |
Ministry of Land, Infrastructure and Transport, "The Standard Specification of Temporary Structure (Design)", 2014.
|
8 |
A. P. Boresi and R. J. Schmidt, "Advanced mechanics of Materials", John Wiley & Sons, Inc., New York, 1993.
|
9 |
S. W. Baek and I. Y. Song, "A Study on the Buckling Characteristics of Pipe Support(V6)", Journal of the Korean Society of Safety, Vol. 26, No. 3, pp. 59-62, 2011.
|
10 |
KOSHA, "The Study on the Resisting Force of Pipe Support", Research Report, 1999.
|