1 |
Y. C. Yang, H. Choi and J. J. Kim, "A Study of Methods on Safety Checklist Improvement and Integrated Operation with Schedule for Construction Accident Prevention", Korean Journal of Construction Engineering and Management, Vol. 5, No. 2, pp. 123-135, 2004.
과학기술학회마을
|
2 |
Y. S. Kim, "Approach to Method of Process Failure Mode and Effect Analysis for Construction Industry", Korean Journal of Construction Engineering and Management, 2002.
|
3 |
H. S. Hong, S. J. Yeo, Y. Heun J. and C. D. Kim, "A Study on the Development of Checklist for Safety Management of Frequently occurred Accident Process in Steel Structural Work", Korean Journal of Construction Engineering and Management, 2004.
|
4 |
Y. T. Hong, J. H. Yu, G. H. Lim and H. S. Lee, "Evaluation of Time-Affecting Factors in High-Rise Building Construction using FMEA", Architectural Institute of Korea, Vol. 20, No. 10, pp. 183-192, 2004.
과학기술학회마을
|
5 |
G. Carter1 and S. D. Smith, "Safety Hazard Identification on Construction Project", Journal of Construction Engineering and Management, Vol. 132, No. 2, pp. 197-205, 2006.
DOI
ScienceOn
|
6 |
S. S. Go, H. S. and H. M. Lee, "Development of the Safety Information Management System according to the Risk Index for the Building Construction Work", Architectural Institute of Korea, Vol. 21, No. 6, pp. 113-120, 2005.
과학기술학회마을
|