Browse > Article

Thermal Stress Evaluation by Elastic-Creep Analysis during Start-up of Boiler Header  

Shin, Kyu-In (Department of Mechanical Engineering, Korea University)
Yoon, Kee-Bong (Department of Mechanical Engineering, Chung Ang University)
Publication Information
Journal of the Korean Society of Safety / v.24, no.2, 2009 , pp. 17-22 More about this Journal
Abstract
Thermal stress and elastic creeping stress analysis was conducted by finite element method to simulate start-up process of a boiler header of 500MW standard fossil power plant. Start-up temperature and operating pressure history were simplified from the real field data and they were used for the thermal stress analysis. Two kinds of thermal stress analysis were considered. In the first case only temperature increase was considered and in the second case both of temperature and operating pressure histories were considered. In the first analysis peak stress was occurred during the temperature increase from the room temperature. Hence cracking or fracture may occur at the temperature far below the operating maximum temperature. In the results of the second analysis von Mises stress appeared to be higher after the second temperature increase. This is due to internal pressure increase not due to the thermal stress. When the stress components of radial(r), hoop($\theta$) and longitudinal(z) stress were investigated, compression hoop stress was occurred at inner surface of the stub tube when the temperature increased from room temperature to elevated temperature. Then it was changed to tension hoop stress and increased because of the operating pressure. It was expected that frequent start-up and shut-down operations could cause thermal fatigue damage and cracking at the stub tube hole in the header. Elastic-creeping analysis was also carried out to investigate the stress relaxation due to creep and stabilized stress after considerable elapsed time. The results could be used for assessing the creep damage and the residual life of the boiler header during the long-tenn service.
Keywords
boiler header; elastic creep analysis; stress relaxation; thermal stress analysis; stub tube;
Citations & Related Records
연도 인용수 순위
  • Reference
1 C.M. Bryan and T. Richard, 'Inspection of Power Plant Headers Utilizing Acoustic Emission Monitoring', NDT & E International Journal, Vol. 32, No.3, pp.167-175,1999   DOI   ScienceOn
2 P. Chellapandi and S.C. Chetal, 'Influence of Mismatch of Weld and Base Material Creep Properties on Elevated Temperature Design of Pressure Vessels and Piping', Nuclear Engineering and Design, Vol. 195, pp. 189 -196, 2000   DOI   ScienceOn
3 ABAQUS Version 6.5, Hibbitt, Karlsson & Sorensen Inc., 2005
4 엄달선, '열전달계수에 대한 새로운 고찰 및 고중압 터빈 케이싱 모형의 열응력해석', 대한기계학회추계학술대회 논문집, pp.425-429, 2004
5 L Nonaka, 'Residual Life Evaluation and Repair Procedure for High Temperature Boiler Piping', OMMI, Vol. 2, No.1, pp. 1-14,2003
6 이진상, 백운봉, 윤기봉, '소형 기력발전용 터빈로터의 수명평가를 위한 열응력해석', 한국에너지공학회지, Vol.9, No.3, pp.184-191,2000