Browse > Article
http://dx.doi.org/10.6109/jkiice.2011.15.9.1854

Framework design of simulation-based ship production execution system(SPEXS) in a shipyard  

Lee, Kwang-Kook (경남대학교)
Abstract
Production planning is one of the most important activities in shipbuilding enterprises. Shop-floor supervisors and planners still do not have enough information to effectively analyze shop operations because of the difference between production planning and shop-floor scheduling. In this paper, process analysis was conducted between production planning and shop-floor control to clarify the difference, and the necessity of the manufacturing execution system(MES) was derived in a shipyard. Therefore, the simulation-based ship production execution system(SPEXS) was defined by analyzing characteristics of MES. The architectural functions of the system were deducted from the process of requirement analysis. The SPEXS' framework was constructed on the basis of the architectural functions. This framework will provide more reliable production schedules and allow engineers to plan and control shop operations in real-time.
Keywords
production planning & scheduling; manufacturing execution system(MES); digital manufacturing; discrete-event simulation; optimization;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 D.Steinhauer, "SAPP-simulation aided production planning at Flensburger", Proceedings of COMPIT'06, pp.391-398, 2006.
2 G.Wohlke and E.Schiller. "Digital Planning Validation in automotive industry", Computers in Industry, Vol.56, Is.4, pp.393-405, 2005.   DOI   ScienceOn
3 K.M.Kelly, "The importance of MES-PLM integration", Automotive Design & Production, Vol.119, Is.8, pp.54-58, 2007.
4 S.Weygandt, "Getting the MES model - methods for system analysis", Instrumentation, Systems and Automation Society Transactions, Vol.35, Is.2, pp.95-103, 1996.
5 K.Aoyama, T.Nomoto, and L.Watanabe, "Development of shipyard simulator based on Petri nets", Journal of Marine Science and Technology, Vol.4, No.1, pp.35-43, 1999.   DOI   ScienceOn
6 J.G.Shin, K.K.Lee, J.H.Woo, W.D.Kim, J.H.Lee, S.H.Kim, J.Y.Park, H.J.Yim, "A modeling and simulation of production process in subassembly lines at a shipyard", Journal of Ship Production, Vol.20, No.2, pp.79-83, 2004.
7 M.Krause, F.Roland, D.Steinhauer, M.Heinemann, "Discrete event simulation: An efficient tool to assist shipyard investment and production planning", Journal of Ship Production, Vol.20, No.3, pp.176-182, 2004.
8 C.Nedess, A.Friedewald, L.Wagner, M.Hubler, "Simulation of material flow processes in the planning of production spaces in shipbuilding", Proceedings of COMPIT '06, pp.186-198, 2006.
9 ISO/IEC 15288: 2002, "Systems engineering-System life cycle processes", Geneva: International Organization for Standardization, issued 1, 2002.
10 S.Kirkpatrick, C.D.Gelatt, and M.P.Vecchi, "Optimization by simulated annealing", Science, Vol.220, No.4598, pp.671-680, 1983.   DOI   ScienceOn
11 황인혁, 노재규, 이광국, 신종계, "시뮬레이티드 어닐링을 활용한 조선 소조립 라인 소일정계획 최적화", 한국시뮬레이션학회논문지, Vol.19, No.1, pp.73-82, 2010.
12 송영주, 이광국, 이동건, 우종훈, 신종계, "시뮬레이션 기반 실행 지원 시스템", 한국정밀공학회 2008년도 춘계학술대회 논문집, pp.913-914, 2008.
13 J.Fraser, "MES explained: a high level vision", White Paper, No.6, Pittsburgh, PA, 1997. MESA International. Available from: http://www.mesa.org [Accessed 4 July 2011].
14 T.Y.Park, K.H.Han, B.K.Choi, "An object-oriented modeling framework for automated manufacturing system", International Journal of Computer Integrated Manufacturing, Vol.10, No.5, pp.324-334, 1997.   DOI   ScienceOn
15 F.T.Cheng, E.Shen, J.Y.Deng, K.Nguyen, "Development of a system framework for the computer-integrated manufacturing execution system: a distributed object-oriented approach", International Journal of Computer Integrated Manufacturing, Vol.12, No.5, pp.384-402, 1999.   DOI   ScienceOn
16 B.K.Choi, B.H.Kim, "MES(manufacturing execution system) architecture for FMS compatible to ERP (enterprise planning system)", International Journal of Computer Integrated Manufacturing, Vol.15, No.3, pp. 274-284, 2002   DOI   ScienceOn
17 H.Ju, "An overview of MES solution trends and a strategy for successful MES deployment", Samsung SDS Consulting Review, Vol.3, No.2, pp.69-79, 2006.
18 L.K.Church, and R.Uzsoy, "Analysis of periodic and event-driven rescheduling policies in dynamic shops", International Journal of Computer Integrated Manufacturing, Vol.5 No.3, pp.153-163, 1992.   DOI
19 V.R.Prasad, M.Graul, P.Benjamin, P.D.Cahill, R.Mayer, "Resource-constrained shop-level scheduling in a shipyard", Journal of Ship Production, Vol.19, No.2, pp.65-75, 2003.
20 A.Pfeiffer. B.Kádár, L.Monostori, D. Karnok, "Simulation as one of the core technologies for digital enterprises: assessment of hybrid rescheduling methods", International Journal of Computer Integrated Manufacturing, Vol.21 No.2, pp.206-214, 2007.
21 Y.Okumoto, H.Kentaro, and U.Noritaka. "Simulation- Based Ship Production Using Three-Dimensional CAD", Journal of Ship Production, Vol.22, No.3, pp.155-159, 2006.