SAT#1 (Preliminary Integration) Test Results of KASS System  

Jeong, Hwanho (SBAS System Engineering & Integration Team, KASS Program Office, Korea Aerospace Research Institute)
Jang, HyunJin (SBAS System Engineering & Integration Team, KASS Program Office, Korea Aerospace Research Institute)
Kim, Koontack (SBAS System Engineering & Integration Team, KASS Program Office, Korea Aerospace Research Institute)
Lee, Jaeeun (SBAS System Engineering & Integration Team, KASS Program Office, Korea Aerospace Research Institute)
Lee, ByungSeok (SBAS Program Office, Korea Aerospace Research Institute)
Publication Information
Journal of Positioning, Navigation, and Timing / v.10, no.2, 2021 , pp. 145-151 More about this Journal
Abstract
According to the Korea Augmentation Satellite System (KASS) system milestone, Site Acceptance Test (SAT) has three steps test until the end of the project. SAT#1 is the first time of SAT steps and verify the KASS Reference Station (KRS) and Sub System (S/S) for the monitoring and controllable. After the equipment and software were installed at the Mission Control Center (MCC) with Central Monitoring and Control Simulator (CMS) for the SAT#1, the 1:1 test was progressed when the KRS and S/S are ready to test. SAT#1 has a 10 steps test case and it was progressed each KRS sites. The test was finished throughout the real-time monitoring and the data collection including the data analysis all of the 7 KRS sites. Finally SAT#1 was completed on December 2020 with successfully.