1 |
Braam, H. and Eecen, P.J. (2005). Assessment of wind and wave data measured at IJmuiden Munitiestortplaats. "Operation and Maintenance" consortium.
|
2 |
Jung, W.M., Oh, S.B., Chae, J.W. and Kim, S.I. (1997). Analysis of the wave-induced downtime for Pohang New Harbor. Journal of Korean Society of Coastal and Ocean Engineers, 9(1), 24-34 (in Korean).
|
3 |
Kim, J.K., Kim, J.Y. and Lee, J.S. (2012). Analysis on Offshore Working Time of Demonstration Offshore Wind Farm in the Southern Part of West Sea. Korea Wind Energy Association.
|
4 |
O&M aspects of the 500MW offshore wind farm at NL7, DOWEC project report, 2002.
|
5 |
Regulations on industrial safety standards, Ministry of Labor, 2006.
|