1 |
Choi, H.S. (1995). 'Expansion Analysis of Offshore Pipelines Close to Restraints', Proc. of 5th Int. Offshore and Polar Engineering Conference, Vol 2, pp 81-88
|
2 |
Palmer, A. and Ling, M.T.S. (1981). 'Movement of Submarine Pipelines Close to Platforms', Proc. of Offshore Tech Conference, arc 4067, pp 314-319
|
3 |
Choi, H.S. (1999). 'Behaviors of High Temperature and High Pressure Marine Pipelines', Journal of Ocean Engineering and Technology, Vol 2, No 2, pp 1-6
|
4 |
Harrison, G.E., Kershenbaum, N.Y. and Choi, B.S. (1997). 'Expansion Analysis of Subsea Pipe-In-Pipe Flowline', Proc. of 7th Int. Offshore and Polar Engineering Conference, Vol 2, pp 293-298
|
5 |
Kershenbaum, N.Y., Harrison, G.E. and Choi, H.S. (1996). 'Subsea Pipeline Lateral Deviation Due to High Temperature Product', Proc. of 6th Int. Offshore and Polar Engineering Conf. Vol 2, pp 74-79
|
6 |
Bai, Y. (2001). Pipelines and Risers, Elsevier Ocean Engineering Book Series, Vol 3
|
7 |
Choi H.S. (2002). 'Expansion Analysis of Subsea Pipe-in-Pipe Due to High Temperature and High Pressure Product', Journal of Ocean Engineering and Technology, Vol 16, No 5, pp 56-60
|