1 |
Barltrop, N.D.P. (1998). Floating Structures: A guide for Design and Analysis, The Center for Marine and Petroleum Technology
|
2 |
Dhillon, B.S. (2003). Engineering Safety, World Scientific
|
3 |
Hobbs, M. (1965). 'Mohole Phase 2 on Schedule: Cost Now up to $100 Million', World Oil, October, pp 99-100
|
4 |
Lambert, D.E. (1966). 'Will the U. S. Lose Race to Inner Space', World Oil, July, pp 5-9
|
5 |
Leathers R.B. (1959). 'World's Largest Submarine Gas Line Boosts Lake Maracaibo Conservation', World Petroleum, July, pp 44-45
|
6 |
Lee, G.C. (1978). 'Deep Thought on Conventional Concepts', Offshore, April, pp 90-92
|
7 |
Lee, G.C. (1982). 'Design and Construction of Deepwater Jacket Platforms', Third International Congress on the Behaviour of Offshore Structures (BOSS), Massachusetts Institute of Technology, Cambridge, pp 102-106
|
8 |
Pratt, J.A., Priest, T. and Castaneda, C.J. (1997). Offshore Pioneers: Brown & Root and the History of Offshore Oil and Gas, Gulf Publishing Company, Houston, Texas
|
9 |
Pratt, J.A. and Castaneda, C.J. (2000). Builders: The Brown Brothers of Houston, Texas A&M University Press, College Station, Texas
|
10 |
Speer, J.W., Nutter, T. and Albaugh, E.K. (2004). 2004 Worldwide Survey of Spars, DDCVs, Offshore, November
|
11 |
Tonking, W.H. (1966). 'Project Mohole - Exploring the Earth's Crust', Royal Society of Art. & Commerce, May, pp 980-997
|
12 |
Bai, Y. (2003). Marine Structural Design, Elsevier
|
13 |
Nutter, T. and Albaugh E. K. (2005). 2005 Worldwide Survey of TLPs, TLWPs, Offshore, October
|
14 |
Boening, D.E. and Howell, E.R. (1984). 'Lena Guyed Tower Project Overview', Offshore Technology Conference, OTC 4649, Houston, Texas, pp 13-18
|
15 |
McGhee, E. (1965). 'New Maracaibo Gas-Compression Platforms Marks Design Milestone', Oil & Gas Journal, September, pp 90-92
|
16 |
Guo, B., Song, S., Chacko, J. and Ghalambor, A. (2005). Offshore Pipelines, Elsevier
|
17 |
LeBlanc, L. (1978). 'Platform Economics: A Costly Game', Offshore, December, pp 46-50
|
18 |
Calvert, J.W. (1957). Gulf Offshore Activity Booming, World Petroleum, 49
|
19 |
Dunn, F.P. (1994). 'Deepwater Production: 1950-2000', Offshore Technology Conference, OTC 7627, Houston, Texas, pp 923-926
|
20 |
Howe, R.J. (1969). The History and Current Status of Offshore Mobile Drilling Units, Ocean Industry
|
21 |
Glasscock, M.S. and Turner, J.W. (1984). 'Design of the Lena Guyed Tower', Offshore Technology Conference, OTC 4650, Houston, Texas, pp 19-25
|
22 |
Hruska, S. and Koehler A. (1969). 'Computer Aided Design of Marine Structures', Proceedings of Offshore Exploration Conference, New Orleans, Louisiana, pp 45-49
|
23 |
Paik, J.K. and Thayamballi, A.K. (2006). Advanced Engineering for Ship-Shaped Offshore Installations, Cambridge University Press, to be published
|
24 |
Nutter, T. and Albaugh E.K. (2005). 2005 Worldwide Survey of Floating Production Storage and Offloading Units, Offshore, August
|
25 |
Lee, G.C. (1968). 'Offshore Structures: Past, Present, Future and Design Considerations', Proceedings of Offshore Exploration Conference, New Orleans, Louisiana, pp 1-9
|
26 |
Mangiavacchi, A., Abbot, A., Hanna, S.Y. and Suhendra R. (1980). 'Design Criteria of a Pile Founded Guyed Tower', Offshore Technology Conference, OTC 3882, Houston, Texas, pp 275-276
|
27 |
Minor, L.E. (1966). 'Improving Deep Sea Pipeline Techniques', Offshore, June, pp 55-56
|