Browse > Article

Design Criteria of a Future Container Crane for Megaships  

LEE SUK-JAE (Interdisciplinary Program in Mechatronics of Pusan National University)
HONG KEUM-Shik (Division of Mechanical Engineering, Pusan National University)
Publication Information
Journal of Ocean Engineering and Technology / v.18, no.6, 2004 , pp. 101-107 More about this Journal
Abstract
In this paper, the design criteria of future container crane for megaships are investigated. The current loading/unloading capacity of a typical container crane, roughly 30 moves/hr, is too law to meet the requirements of future super containerships, which are expected over 15,000 TEU. After examining the transition of containerships through the years and studying the research trend in developed countries, the specifications of the container crane that can Meet a 15,000 TEU containership are proposed. The structure, trolley and hoist mechanism, outreach, backreach, capacity, speeds, durability, and stability of the future container crane are described.
Keywords
Container Crane; Performance Specification; Design Criteria; Cargo Handling; Port Automation;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 신민생, 이충환, 김상봉 (1998). '컨테이너 하역장에서 고속운송을 위한 크레인시스템의 개발', 한국해양공학회지, 제12권, 제4호, pp 124-131
2 한국기계연구윈, 현대중공업(2004). 첨단항만 핵심기술 개발보고서, 해양수산부
3 Bhhnani, K. and Kerenyi, J. (1995). 'Rope-towed Trolley or Machinery Trolley which is better?', The Facilities Engineering Seminar American Assodation of Port Authorities, San Pedro, CA,No 15-17 pp 1-9
4 August Design, LLC, Advanced Robotic Crane for Container Handling, http://www.august-design.com
5 Bhimani, K., Morris, C.A. and Karasuda, S. (1996). 'Dockside Container Crane Design for the 21st Century', Container Effidency Conference World Trade Center, Singapore
6 Jordan, M.A. and Rudolf III, C.D. (1993). 'New Container Crane Concepts', The Facilities Engineering Sernmar American Association of Port Authorities, Savannah, Georgia, pp 1-15
7 이진우, 여태경, 안휘웅, 김상봉 (1998). '2자유도 서보제어기를 이용한 크레인의 Anti-Sway제어', 한국해양공학회지, 제12권, 제4호,PP 17-23
8 HonG K.T., Huh, C.D. and Hong, K.S. (2003). 'Command Shaping Control for Limiting the Transient Sway Angle of Crnae Systems', International Journal of Control, Autoniation, and Systems, VoI 1, No 1, pp 43-53
9 홍금식 (1999).'컨테이너 기중기의 제어: 수정된 시간체적주행과 비선형 잔류흔들림 제어', 제어.자동화.시스템공확회논문지, 제5권, 제5호,pp 630-639
10 Bhimani, K. and Jordan, M.A. (2003). A Few Facts about Jumbo Cranes, http://www.liftech.net
11 Kirn, Y.S. (2002). Control Systems for Suppressing Sway of a Suspended Load without a Vision System, Ph.D. Dissertation, Department of Electrical Engineehng, Seoul National University
12 강민우, 홍금식 (2004). '시간체적제어를 이용한 지브크레인의 흔들림제어', 한국해양공학회지(심사중)
13 Jordan, M.A. (2001). Future-Proof Your Crane, http://www.liftech.net.
14 남기찬, 이재현 (2002).'초대형 컨테이너 선박에 대한 이론적 인 고찰', 한국항해항만학회지, 제26권, 제4호,pp 455-463
15 홍금식, 손성철, 이만형 (1997a). '컨테이너 크레인의 흔들림제어 (PartI):모델링, 제어전략, 기준선도를 통한 오차 피이드백 제어', 제어.자동화.시스템공학논문지, 제3권, 제1호,pp 23-31
16 손유식, 김영복 (2000). '컨테이너 크레인의 흔들림 방지장치 개발에 관한 연구', 한국해양공학회지, 제14권, 제4호,pp 35-42
17 홍금식, 손성철, 이만형 (1997b). '컨테이너 크레인의 흔들림제어 (Part II):트로리 주행속도 조절을 통한 진자운동의 제어', 제어.자동화.시스템공학논문지, 제3권, 제2호,pp 132-138
18 Bhimani, K. and Hoite, S. (1998). 'Machinery Trolley Cranes', P0RT98 Poceedings of the Conference American Society of Civil Engineers, Long Beach, pp 603-613