Numerical Study on Medium-Diameter EPB Shield TBM by Discrete Element Method |
Choi, Soon-Wook
(Department of Infrastructure Safety Research, Korea Institute of Civil Engineering and Building Technology)
Park, Byungkwan (Smart City & Construction Engineering, University of Science and Technology) Kang, Tae-Ho (Department of Infrastructure Safety Research, Korea Institute of Civil Engineering and Building Technology) Chang, Soo-Ho (Construction Startup Promotion Center, Korea Institute of Civil Engineering and Building Technology) Lee, Chulho (Department of Infrastructure Safety Research, Korea Institute of Civil Engineering and Building Technology) |
1 | Maynar, M. J. and Rodriguez, L. E. (2005), "Discrete numerical model for analysis of earth pressure balance tunnel excavation", Journal of Geotechnical and Geoenvironmental Engineering, Vol.131, No.10, pp.1234-1242. DOI |
2 | Peng, B. (2014), Discrete element method (DEM) contact models applied to pavement simulation, Ph.D Thesis, Virginia Polytechnic Institute and State University, pp.19-23. |
3 | Peila, D., Picchio, A. and Chieregato, A. (2013), "Earth pressure balance tunnelling in rock masses: Laboratory feasibility study of the conditioning process", Tunnelling and Underground Space Technology, Vol.35, April 2013, pp.55-66. DOI |
4 | Avunduk, E. and Copur, H. (2018), "Empirical modeling for predicting excavation performance of EPB TBM based on soil properties", Tunnelling and Underground Space Technology, Vol.71, January 2018, pp.340-353. DOI |
5 | Bandini, A., Berry, P., Cormio, C., Colaiori, M. and Lisardi, A. (2017), "Safe excavation of large section tunnels with Earth Pressure Balance Tunnel Boring Machine in gassy rock masses: The Sparvo tunnel case study", Tunnelling and Underground Space Technology, Vol.67, August 2017, pp.85-97. DOI |
6 | Gharahbagh, E. A., Mooney, M. A., Frank, G., Walter, B. and Di Ponio, M. A. (2013), "Periodic inspection of gauge cutter wear on EPB TBMs using cone penetration testing", Tunnelling and Underground Space Technology, Vol.38, September 2013, pp.279-286. DOI |
7 | Copur, H., Aydin, H., Bilgin, N., Balci, C., Tumac, D. and Dayanc, C. (2014), "Predicting performance of EPB TBMs by using a stochastic model implemented into a deterministic model", Tunnelling and Underground Space Technology, Vol.42, May 2014, pp.1-14. DOI |
8 | Cundall, P. A. (1971), A computer model for simulating progressive, large scale movement in blocky rock systems, In Proceedings of the International Symposium on Rock Mechanics. Vol.2, pp.129-136. |
9 | Cundall, P. A. and Strack, O. D. (1979), A discrete numerical model for granular assemblies, geotechnique, Vol.29, No.1, pp.47-65. DOI |
10 | Herrenknecht. (2008), EPB Shield. Fast tunnelling technology with a broad application range, Herrenknecht, Germany. |
11 | Amoun, S., Sharifzadeh, M., Shahriar, K., Rostami, J. and Azali, S. T. (2017), "Evaluation of tool wear in EPB tunneling of Tehran Metro, Line 7 Expansion", Tunnelling and Underground Space Technology, Vol.61, January 2017, pp.233-246. DOI |
12 | Lee, C., Chang, S. H., Choi, S. W., Park, B., Kang, T. H. and Sim, J. K. (2017b), Numerical Study of Face Plate-Type EPB Shield TBM by Discrete Element Method, Journal of the Korean Geosynthetics Society, Vol.16, No.4, pp.163-176. (in Korean) DOI |
13 | Wassgren, C. and Sarkar, A. (2008), "PSL DEM Lecture 06: Introduction to Soft-Particle DEM and Normal Contact Force Models - Part I. |
14 | Wu, L., Guan, T. and Lei, L. (2013), "Discrete element model for performance analysis of cutterhead excavation system of EPB machine", Tunnelling and Underground Space Technology, Vol.37, August 2013, pp.37-44. DOI |
15 | Wu, L. and Liu, C. (2014), "Modeling of shield machine tunneling experiment by discrete element method", Applied Mechanics and Materials, Vols.556-562, pp.1200-1204. DOI |
16 | Ucgul, M., Fielke, J. M. and Saunders, C. (2014), Threedimensional discrete element modelling of tillage: Determination of a suitable contact model and parameters for a cohesionless soil, Biosystems Engineering, Vol.121, May 2014, pp.105-117. DOI |
17 | ITA, W. (2000), Mechanized Tunnelling: Recommendations and Guidelines for Tunnel Boring Machines (TBMs), Publication No. MAI 2001 - ISSN 1267-8422, International Tunnelling Association, Lausane, Switzerland. |
18 | KICT. (2015), Development of optimized TBM cutterhead design method and high-performance disc cutter, Publication No. ISBN 979-11-954377-2-6, Korea Agency for Infrastructure Technology Advancement, Anyang-si, Republic of Korea. (in Korean) |
19 | Lee, C., Chang, S. H., Choi, S. W., Park, B., Kang, T. H. and Sim, J. K. (2017a), Preliminary study on a spoke-type EPB shield TBM by discrete element method, Journal of Korean Tunnelling and Underground Space Association, Vol.19, No.6, pp.1029-1044. (in Korean) DOI |
20 | Shi, H., Yang, H., Gong, G. and Wang, L. (2011), Determination of the cutterhead torque for EPB shield tunneling machine. Automation in Construction, Vol.20, No.8, pp.1087-1095. DOI |
21 | Maidl, U. and Comulada, M. (2011), "Prediction of EPB shield performance in soils", Proc. of the In Rapid Excavation and Tunneling Conference, January 2011, pp.1083-1091. |