Improving Reliabilities of Dam Displacement based on Monitoring Given Points by Total Station |
Kang, Gi-Chun
(Department of Civil Engineering, Engineering Research Institute, Gyeongsang National University)
Kim, Bong-Jae (Dam & Watershed Maintenance Department, K-water) Hong, Seok-Woo (Chunju Construction Office, K-water) Yim, Yeon-Chool (System Integration Team, Baytech Korea Inc.) Kim, Ji-Seong (Research Institute for Infrastructure Performance, Korea Infrastructure Safety Corporation) |
1 | Chang, P. W., Park, Y. K., and Woo, C. W. (1998), "Evaluation of Degradation and Safety of Small Agricultural Reservoir-Case Study for Kosam Reservoir in Kyungki Provice", Journal of the Korean Society of Agricultural Engineers, Vol.40, No.1, pp.49-56. |
2 | Choi, J., Kim, D., Lim, J., and Kang, Y. (2013), "An Experimental Study on GNSS for Measuring Structure Displacement", 2013 Annual Conference of Korean Society of Hazard Mitigation, p.204. |
3 | Federal Energy Regulatory Commission (1991), Engineering Guidelines for the Evaluation of Hydropower Projects, FERC, pp.13-18. |
4 | Jansen, Robert B. (1983). Dams and Public Safety, United States Department of the Interior, p.94. |
5 | Japan Institute of Country-ology and Engineering (2008), Commentary.Cabinet Order concerning Structural Standards for River Management Facilities, etc, Japan River. |
6 | Kim, K.-Y, Kim, C.-Y., Lee, S.-D., Seo, Y.-S., and Kee, C.-I. (2007), "Measurement of Tunnel 3-D Displacement using Digital Photogrammetry", The Journal of Engineering Geology, Vol.17, No.4, pp.559-568. |
7 | Topcon Korea (2014), User Manual for Total Station MS Series, Topcon Korea Corporation, pp.20-32. |