1 |
Koener, R. M. and Soong, T. Y. (2001), "Geosynthetic Reinforced Segmental Retaining Walls", Geotextiles and Geomembranes, 19(6), pp.359-386.
DOI
ScienceOn
|
2 |
Korea Expressway Corporation (2007), Reinforced Retaining Wall Design Standard, Korea Expressway Corporation, Kyeonggi, Korea.
|
3 |
Korea Geosynthetice Society (2010), Method of Reinforced Retaining Wall Construction, CIR, Seoul, Korea, pp.55-57.
|
4 |
Korea Infrastructure Safety & Technology Corporation (2011), Construction Work Slop Design Standard, Ministry of Land, Transportation and Marintime Affairs, Government Complex Sejong, Korea.
|
5 |
NIMR (2011), "Climate change scenario report for IPCC 5th valuation report response", National institute of Meteorogical Research.
|
6 |
Park, Y. J. (2010), The Improvement of Drain System for Mechanical Stabilized Earth Wall, Master Thesis, Kyeonggi University.
|
7 |
Yoo, C. S., Jung, H. Y. and Jung, H. S. (2004), "A Case Study in a Rainfall Induced Failure of Geosynthetics-Reinforced Segmental Retaining Wall", Korea Geosynthetice Society Conference Fall 2004, pp.51-59.
|
8 |
Yoo, C. S., Jung, H. Y. and Jung, H. S. (2005), "Geosynthetics- Reinforced Segmental Retaining Wall Failure during Heavy Rainfall - A Case Study", Journal of Korean Geotechnical Society, Vol.21, No.4, pp.135-143.
|