1 |
J. Chen et al., "Scalability and QoS Guarantee for Streams with (m,k)-Firm Deadline," Computer Standards and Interfaces, vol. 28, issue 5, Jun. 2006, pp. 560-571.
DOI
ScienceOn
|
2 |
T. Wu and S. Jin, "Weakly Hard Real-Time Scheduling Algorithm for Multimedia Embedded System on Multiprocessor Platform," IEEE Int. Conf. Ubi-Media Computing, 2008.
|
3 |
L. Niu and G. Quan, "A Hybrid Static/Dynamic DVS Scheduling for Real-Time Systems with (m, k)-Guarantee," IEEE Int. Real-Time Systems Symp., 2006.
|
4 |
C.D. Locke, Best Effort Decision Making for Real-Time Scheduling, PhD Thesis, Carnegie Mellon University, 1986.
|
5 |
J. Li, Y. Song, and F. Simonot-Lion, "Providing Real-Time Applications with Graceful Degradation of QoS and Fault Tolerance According to (m,k)-Firm Model," IEEE Trans. Ind. Inf., May 2006, pp. 112-119.
|
6 |
F. Flavia et al., "Optimal On-Line (m,k)-Firm Constraint Assignment for Real-Time Control Tasks Based on Plant State Information," IEEE Int. Conf. Emerging Technologies and Factory Automation, 2008, pp. 908-915.
|
7 |
A. Striegel and G. Manimaran. "Best-Effort Scheduling of (m, k)-Firm Real-Time Streams in Multihop Networks," Proc. 15 IPDPS 2000 Workshops Parallel Distrib. Process., 2000, pp 743-751.
|
8 |
S. Lai, B. Ravindran, and H. Cho, "On Scheduling Soft Real- Time Tasks with Lock-Free Synchronization for Embedded Devices," ACM Symp. Applied Computing (SAC), Mar. 2009, pp. 1685-1686.
|
9 |
G. Quan and X. Hu, "Enhanced Fixed-Priority Scheduling with (m,k)-Firm Guarantee," IEEE RTSS, 2000, pp. 79-88.
|
10 |
G. C. Buttazzo, Hard Real-Time Computing Systems: Predictable Scheduling Algorithms and Applications, Kluwer Academic Publishers, 1997.
|
11 |
J. Lin and A.M.K. Cheng, "Maximizing Guaranteed QoS in (m,k)-Firm Real-Time Systems," IEEE Int. Conf. Embedded and Real-Time Computing, 2006.
|
12 |
G. Bernat, A. Burns, and A. Llamosi, "Weakly-Hard Real-Time Systems," IEEE Trans. Comput., vol. 50, no. 4, Apr. 2001, pp. 308-321.
DOI
ScienceOn
|
13 |
M. Hamdaoui and P. Ramanathan, "A Dynamic Priority Assignment Technique for Streams with (m, k)-Firm Deadlines," IEEE Trans. Comput., vol. 44, no. 2, 1995, pp. 1443-1451.
DOI
ScienceOn
|
14 |
Z. Wang, J.M. Chen, and Y.X. Sun, "An Integrated DBP for Streams with (m,k)-Firm Real-Time Guarantee," J. Zhejiang University Science, vol. 5, no. 7, 2004, pp. 816-826,
DOI
ScienceOn
|
15 |
E. Poggi et al., "Matrix-DBP For (m, k)-Firm Real-Time Guarantee," Proc. Real-Time and Embedded System, 2003, pp. 457-482.
|
16 |
J. Chen et al,, "Equivalent Matrix DBP for Streams with (m,k)-Firm Deadline," IEEE Int. Symp. Ind. Electron., vol. 1, May 2004, pp. 675-680.
|
17 |
M. Hamdaoui and P. Ramanathan, "Evaluating Dynamic Failure Probability for Streams with (m, k)-Firm Deadlines," IEEE Trans. Comput., vol. 46, no. 12, Dec. 1997, pp. 1325-1337.
DOI
ScienceOn
|
18 |
G. Bernat and R. Cayssials, "Guaranteed On-Line Weakly-Hard Real-Time Systems," IEEE Real-Time System Symp., 2001.
|
19 |
P. Ramanathan, "Overload Management in Real-Rime Control Applications Using (m, k)-Firm Guarantee," IEEE Trans. Parallel Distrib. Syst., vol. 10, no. 6, June 1999, pp. 549-559.
DOI
ScienceOn
|
20 |
C.L. Liu, and J.W Layland, "Scheduling Algorithms for Multiprogramming in a Hard-Real-Time Environment," J. ACM, vol. 20, no. 1, 1973, pp. 46-61.
DOI
|