A Applicability Study on Single Grouted Column Method (C-RJP Grouting) for Buoyancy-Resistant Permanent Anchor in Highly Permeable Volcanic Clastic Zones |
Jung, Yonggun
(Department of Civil Engineering, The University of Suwon)
Chae, Youngsu (Department of Civil Engineering, The University of Suwon) Park, Byunghee (Chung-Ah Engineering Consultants Co., Ltd.) Kim, Jeongryeol (Samwoo Geo-Tech Co., Ltd.) |
1 | Chun, B. S. (2012), Geotechnical engineering theory and practice, pp. 707-729 (in Korean). |
2 | Chun, B. S. (2011), Principles and practice for chemical grouting, pp. 173-180 (in Korean). |
3 | Han-yang University construction technology institute & Chung-Ah Engineering Consultants Co., Ltd. (1998), Research report on feasibility study of C-RJP grouting method and buoyancy resistance anchor method and relevant strategies, pp. 3-180 (in Korean). |
4 | Inworld Construction Co., Ltd. (1998), Jeju hotel construction confirmation drilling research report, pp. 3-13 (in Korean). |
5 | Korean Industrial Standards (1995), PC steel wire and PC steel strands, pp. 3-5 (in Korean). |
6 | Pumyang Construction Co., Ltd. (1998), Jeju hotel construction site C-RJP test construction report, pp. 3-80 (in Korean). |