1 |
Bae, Y. H., Kim, D. H., "The FEM Analysis in Seamless Pipe Expansion Process," Proc. KSMPE Autumn Conf. 2014, p.51, 2014.
|
2 |
Shah, A. R., Abid, M., Wasy, A. and Song, J. I., "Performance of a Gasketed Bolted Pipe Flanged Joint under Bolt up, Internal Pressure and Harmonic Bending Loading," Proc.KSMPE Autumn Conf. 2012, p.145, 2012.
|
3 |
E. Tsuru, T. Kondo, T. Satoh and H. Hasegawa "Loose Flange-type Flared Pipe Joint," Sealing Technology, pp. 12, 2010.
|
4 |
Chen, H. S., Tseng, P. T. and Hwang, S. F., "Failure Analysis of Bolts on an End Flange of a Steam Pipe," Eng. Fail. Anal., Vol. 13, No. 4. pp. 656-668, 2006.
DOI
|
5 |
Kim, W. and Lee, C. M., "A Study on the Manufacture Process Parameters of Stainless/Carbon Composite Material Pipes Fitting", Proc. KSMPE Autumn Conf. 2008, pp. 144-149, 2008.
|
6 |
Ohashi, T. and Hayashi, K., "Lateral Extrusion of A6063 Aluminum Alloy Pipes," J.Mater. Process. Technol., Vol. 138, No. 1-3, pp. 560-563, 2003.
DOI
|
7 |
Akkus, N., Manabe, K., Kawahara, M. and Nishimura, H., "A Finite-element Model for the Superplastic Bulging Deformation of Ti-alloy pipe," J. Mater. Process. Technol., Vol. 68, No. 3, pp. 215-220, 1997.
DOI
|
8 |
Yuan, S. J., Xu, Z., Wang, Z. R. and Hai, W., "The Integrally Hydro-forming Process of Pipe Elbows," Int. J. Pressure Vessels Pip., Vol. 75, No. 1, pp. 7-9, 1998.
DOI
|
9 |
Gursoz, E. L., Choi, Y. and Prinz, F. B., "Boolean Set Operations on Non-manifold Boundary Representation Objects", Comput.-Aided Des., Vol. 23, No. 1, pp. 33-39, 1991.
DOI
|
10 |
Jung, W. J., Kang, H. B., Lee, D. W., Park, M. H., Song, J. H., Lee, S. S., "A study on Press Forming Machine of Titanium and Aluminium Plates Formability" J. Korean Soc. Manuf. Process Eng., Vol. 12, No. 5, pp. 86-93, 2013.
|
11 |
Min, B. H., Jea, W. S., Ye, S. D., "A Study on Forming for Brake Pipe of Automobiles using Finite Element Method" J. Korean Soc. Manuf. Process Eng., Vol. 7, No. 3, pp. 47-49, 2008.
|